Size: 1189
Comment:
|
Size: 1318
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 12: | Line 12: |
* Listed up the modification parts in the 3D CAD model. | |
Line 22: | Line 23: |
=== OMMT & OSTM === | === OMMT & OSTM (Takahashi) === |
Line 24: | Line 25: |
* Ordered the spacer plate and the connector plate. | |
Line 36: | Line 38: |
* VIS repair/upgrade work between O3 and O4 | === VIS repair/upgrade work between O3 and O4 === |
Agenda/Minutes of the VIS Meeting on 2019/8/30
2019/8/30 14:00 -
Participants:
Progress report
Type-A
Past week report
- Listed up the modification parts in the 3D CAD model.
Plan for coming weeks
Type B
Past week report
Plan for coming weeks
Type-Bp
Past week report
Plan for coming weeks
OMMT & OSTM (Takahashi)
Past week report
- Ordered the spacer plate and the connector plate.
Plan for coming weeks
VIS electronics
Past week report
Plan for coming weeks
Other site works
Safety
- Incidents:
Discussion
VIS repair/upgrade work between O3 and O4
Travel Plans
- Travel (Week of 9/2):
- Takahashi:
- Sato:
- Hirata:
- Shoda:
- Fujii:
- Tanaka:
- Travel (Week of 9/9):
- Takahashi:
- Sato:
- Hirata:
- Shoda:
- Fujii:
- Tanaka:
Next meeting
On 2019/9/6(Fri)