Differences between revisions 3 and 4
Revision 3 as of 2019-08-30 09:19:24
Size: 1255
Comment:
Revision 4 as of 2019-08-30 09:25:14
Size: 1318
Comment:
Deletions are marked like this. Additions are marked like this.
Line 12: Line 12:
 * Listed up the modification parts in the 3D CAD model.
Line 37: Line 38:
 * VIS repair/upgrade work between O3 and O4 === VIS repair/upgrade work between O3 and O4 ===

Agenda/Minutes of the VIS Meeting on 2019/8/30

2019/8/30 14:00 -

Zoom Meeting

Participants:

Progress report

Type-A

Past week report

  • Listed up the modification parts in the 3D CAD model.

Plan for coming weeks

Type B

Past week report

Plan for coming weeks

Type-Bp

Past week report

Plan for coming weeks

OMMT & OSTM (Takahashi)

Past week report

  • Ordered the spacer plate and the connector plate.

Plan for coming weeks

VIS electronics

Past week report

Plan for coming weeks

Other site works

Safety

  • Incidents:

Discussion

VIS repair/upgrade work between O3 and O4

Travel Plans

  • Travel (Week of 9/2):
    • Takahashi:
    • Sato:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:
  • Travel (Week of 9/9):
    • Takahashi:
    • Sato:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:

Next meeting

On 2019/9/6(Fri)

KAGRA/Subgroups/VIS/VISMinutes20190830 (last edited 2019-09-02 10:01:32 by RyutaroTakahashi)