Agenda/Minutes of the VIS Meeting on 2019/8/30

2019/8/30 14:00 -

Zoom Meeting

Participants:

Progress report

Type-A

Past week report

  • general
    • performance test of the inertial damping was done with ETMX and ITMX.
      • This will be summarized by Lucia.
    • The simulation model for type-A suspension is now being modified from https://granite.phys.s.u-tokyo.ac.jp/svn/LCGT/trunk/VIS/SuspensionControlModel/script/TypeA/typeA_siso180517.m

      • Originally for my own use though.
      • Some channels and sensor correction paths are added.
      • Some of the filter name was corrected.
      • The updated one is in my local , is to be uploaded to SVN after renaming, adding some paths, if necessary:
        • /kagra/Dropbox/Personal/Fujii/TypeA/simulation/
  • At ETMX
    • trying to tune the sensor-correction gain. Still Ongoing.local note

  • At ITMY
    • A work introducing payload damping filters is started, this work is mainly taken care by Yamada-kun.
  • ITMX
    • Attempts of WFS control demonstration with TM OpLev is ongoing.

      • Beside that, some missing damping filters were implemented as needed.
  • Updated the list of the modification parts in the 3D CAD model.

Plan for coming weeks

Type B

Past week report

Plan for coming weeks

Type-Bp

Past week report

Plan for coming weeks

OMMT & OSTM (Takahashi)

Past week report

  • Dummy mirror was delivered.
  • Ordered the spacer plate and the connector plate.

Plan for coming weeks

VIS electronics

Past week report

Plan for coming weeks

Other site works

Safety

  • Incidents:

Discussion

VIS repair/upgrade work between O3 and O4

  • The list is required by the SEO. They need it for scheduling and arrangement of the site works between O3 and O4 considering the task of all subsystem.
    • One more week was added to the period for EYV work.
    • Recovering of the FRs includes the adjustment of ballast masses. Though needed period depends on the situation, two more weeks were added for each SR3/BS work.
    • Installation of the yaw FR for BS includes the replacement of bearing.
    • The re-gluing of the IM/TM magnets was omitted.
    • Replacement of the ferromagnetic parts on SF in BS/SR3 was added.
    • Expenses will be covered by the 2019FY budget. Spare connectors are included in the budget.
  • Optional
    • Improvement of the FRs with limiter switch.
    • Improvement of the ACCs.
    • Connector supports for the assembled in-vac cables.
    • Replacement of the LVDT cards.
    • Replacement of the LVDT-actuator units in BS.
  • Small items
    • Tuning of BS IP by small ballast.
    • Flip connections in BS IP H2 coil actuator.
    • Replacement of the chipped magnets (12x12x12 mm) for IP in SR3
    • Moving of the electronics to small rack in SR3.
  • List for SEO

  • Brain storming page

Travel Plans

  • Travel (Week of 9/2):
    • Takahashi:
    • Sato:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:
  • Travel (Week of 9/9):
    • Takahashi:
    • Sato:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka: