Differences between revisions 2 and 3
Revision 2 as of 2019-10-18 09:20:53
Size: 1511
Editor: AyakaShoda
Comment:
Revision 3 as of 2019-10-18 13:45:00
Size: 1983
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:

2019/10/18 14:00 - 
2019/10/18 14:00 -
Line 11: Line 10:
[[https://onedrive.live.com/view.aspx?resid=8E8081C20FE5EC3A!2278&ithint=file%2cxlsx&authkey=!AMFNtNa-Y6CVp94|Post-O3 task list]] [[https://onedrive.live.com/view.aspx?resid=8E8081C20FE5EC3A!2278&ithint=file,xlsx&authkey=!AMFNtNa-Y6CVp94|Post-O3 task list]]
Line 17: Line 16:
Line 20: Line 18:
 * Terrence worked in a future implementation of adaptive control taking into account the change in micro-seismic activity. Curretly he's doing simulations in his own computer.
 * Fabian worked in measuring the coupling between BS pitch and yaw degrees of freddom when actuating from ASC channels. See klog entry [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=11037|11037]].
 * Today I began doing the diagonalization but the BS is not available in the afternoon. I'll continue whenever possible.
Line 21: Line 23:
Line 25: Line 26:
Line 30: Line 30:
Line 31: Line 32:
Line 35: Line 35:
Line 37: Line 36:
Line 46: Line 44:
  * Takahashi: 
  * Sato: 
  * Hirata: 
  * Takahashi:
  * Sato:
  * Hirata:
Line 50: Line 48:
  * Fujii:    * Fujii:
Line 54: Line 52:
  * Takahashi: 
  * Sato: 
  * Hirata: 
  * Takahashi:
  * Sato:
  * Hirata:
Line 58: Line 56:
  * Fujii:    * Fujii:

Agenda/Minutes of the VIS Meeting on 2019/10/18

2019/10/18 14:00 -

Zoom Meeting

Participants:

VIS Commissioning Task List

Post-O3 task list

Progress report

Type-A

Past week report

Plan for coming weeks

Type B

Past week report

  • Terrence worked in a future implementation of adaptive control taking into account the change in micro-seismic activity. Curretly he's doing simulations in his own computer.
  • Fabian worked in measuring the coupling between BS pitch and yaw degrees of freddom when actuating from ASC channels. See klog entry 11037.

  • Today I began doing the diagonalization but the BS is not available in the afternoon. I'll continue whenever possible.

Plan for coming weeks

Type-Bp

Past week report

Plan for coming weeks

OMMT & OSTM (Takahashi)

Past week report

  • Moved the present OSTM suspension in the OMC chamber.
  • Assembled the new OSTM suspension using the dummy mirror.

Plan for coming weeks

VIS electronics

Past week report

Plan for coming weeks

Other site works

Safety

  • Incidents:

Discussion

  • Strategy to re-hang the payloads for SRs and PRs. T1910894 (Hirata & Shoda)

Travel Plans

  • Travel (Week of 10/21):
    • Takahashi:
    • Sato:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:
  • Travel (Week of 10/28):
    • Takahashi:
    • Sato:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka: