Agenda/Minutes of the VIS Meeting on 2019/10/18
2019/10/18 14:00 -
Participants: Takahashi, Sato, Fabian, Okutomi, Fujii, Hirata, Shoda, Tanaka, Lucia
Progress report
Type-A
Past week report
Plan for coming weeks
Type B
Past week report
- Terrence worked in a future implementation of adaptive control taking into account the change in micro-seismic activity. Curretly he's doing simulations in his own computer.
Fabian worked in measuring the coupling between BS pitch and yaw degrees of freddom when actuating from ASC channels. See klog entry 11037.
- Today I began doing the diagonalization but the BS is not available in the afternoon. I'll continue whenever possible.
Plan for coming weeks
Type-Bp
Past week report
Plan for coming weeks
OMMT & OSTM (Takahashi)
Past week report
- Moved the present OSTM suspension in the OMC chamber.
- Assembled the new OSTM suspension using the dummy mirror.
Plan for coming weeks
VIS electronics
Past week report
- WD boards have been delivered.
- Obtained a quotation for the touch sensor converter.
Plan for coming weeks
- Reasssembly of WD.
Other site works
Safety
- Incidents:
Discussion
Strategy to re-hang the payloads for SRs and PRs. T1910894 (Hirata & Shoda)
Travel Plans
- Travel (Week of 10/21):
- Takahashi:
- Sato:
- Hirata:
- Shoda:
- Fujii: -10/22 or 23
- Tanaka:
- Travel (Week of 10/28):
- Takahashi:
- Sato:
- Hirata:
- Shoda:
- Fujii:
- Tanaka:
Next meeting
On 2019/10/25(Fri)