Agenda/Minutes of the VIS Meeting on 2020/3/13
2020/3/13 14:00 -
Participants:
Progress report
Type-A
Past week report
Plan for coming weeks
Type B
Past week report
I wrote a document with guidelines for the design the oplev boxes: JGW-E2011540-v1.
- It's intended for Mirapro.
- Some information still needs to be included.
- Please give me feedback in case you feel like.
- A 3D-CAD is included.
I measured transfer functions from some BS DoF to DARM: klog entries 13463 and 13477.
- Projections of noise onto DARM not done yet.
Plan for coming weeks
Type-Bp
Past week report
Plan for coming weeks
Type-C
Past week report
Plan for coming weeks
VIS electronics
Past week report
Plan for coming weeks
Safety
Discussion
Travel Plans
- Travel (Week of 3/16):
- Takahashi: 16-18
- Sato:
- Hirata:
- Shoda:
- Fujii:
- Tanaka:
- Travel (Week of 3/23):
- Takahashi:
- Sato:
- Hirata:
- Shoda:
- Fujii:
- Tanaka:
Next meeting
On 2020/3/27(Fri)