Participants: | Participants: Takahashi, Sato, Hirata, Ishizaki, Shoda, Tanaka, Aso, Fabian, Lucia |
Line 14: | Line 14: |
[[https://paper.dropbox.com/doc/Plan-for-the-long-OR-brake--AxxlJFvK1IGJjqrG5nfdHfGXAQ-KqexeqMaCA7DITFGxA5ih|Plan for the long OR brake]] |
|
Line 18: | Line 20: |
* Uploaded the mechanical assembly procedure for TF FR (Yaw and Vertical) with limit switch.[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11598|Link to doc]] | |
Line 32: | Line 34: |
* Considered if the board for additional filters can fit the remain space in the combiner box. It is difficult. * We should go to remake the board including original filter, additional filter, and pin assignment changer. |
Agenda/Minutes of the VIS Meeting on 2020/4/10
2020/4/10 14:00 -
Participants: Takahashi, Sato, Hirata, Ishizaki, Shoda, Tanaka, Aso, Fabian, Lucia
Progress report
Type-A
Past week report
Revising the Type-A installation procedure.
Uploaded the mechanical assembly procedure for TF FR (Yaw and Vertical) with limit switch.Link to doc
Plan for coming weeks
Type B
Past week report
Plan for coming weeks
Type-Bp
Past week report
- Assembled and tested the mirror rehanging jig.
Plan for coming weeks
Type-C
Past week report
Plan for coming weeks
VIS electronics
Past week report
- Considered if the board for additional filters can fit the remain space in the combiner box. It is difficult.
- We should go to remake the board including original filter, additional filter, and pin assignment changer.
Plan for coming weeks
Safety
Discussion
Travel Plans
Next meeting
On 2020/4/17(Fri)