Differences between revisions 4 and 5
Revision 4 as of 2020-04-10 14:35:56
Size: 1611
Comment:
Revision 5 as of 2020-04-10 14:41:24
Size: 1836
Comment:
Deletions are marked like this. Additions are marked like this.
Line 34: Line 34:
 * Considered if the board for additional filters can fit the remain space in the combiner box. It is difficult.
 * We should go to remake the board including original filter, additional filter, and pin assignment changer.

Agenda/Minutes of the VIS Meeting on 2020/4/10

2020/4/10 14:00 -

Zoom Meeting

Participants: Takahashi, Sato, Hirata, Ishizaki, Shoda, Tanaka, Aso, Fabian, Lucia

VIS Commissioning Task List

Post-O3 task list

Schedule afetr O3

Plan for the long OR brake

Progress report

Type-A

Past week report

Plan for coming weeks

Type B

Past week report

Plan for coming weeks

Type-Bp

Past week report

  • Assembled and tested the mirror rehanging jig.

Plan for coming weeks

Type-C

Past week report

Plan for coming weeks

VIS electronics

Past week report

  • Considered if the board for additional filters can fit the remain space in the combiner box. It is difficult.
  • We should go to remake the board including original filter, additional filter, and pin assignment changer.

Plan for coming weeks

Safety

Discussion

Travel Plans

Next meeting

On 2020/4/17(Fri)

KAGRA/Subgroups/VIS/VISMinutes20200410 (last edited 2020-04-10 14:49:23 by NaoatsuHirata)