Size: 1836
Comment:
|
Size: 1873
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 19: | Line 19: |
* Revising the [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5500|Type-A installation procedure]]. * Uploaded the mechanical assembly procedure for TF FR (Yaw and Vertical) with limit switch.[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11598|Link to doc]] |
* Revising the [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5500|Type-A installation procedure]]. (Takahashi) * Uploaded the mechanical assembly procedure for TF FR (Yaw and Vertical) with limit switch.[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11598|Link to doc]] (Sato) |
Line 27: | Line 27: |
* Assembled and tested the mirror rehanging jig. | * Assembled and tested the mirror rehanging jig. (Hirata) |
Line 34: | Line 34: |
* Considered if the board for additional filters can fit the remain space in the combiner box. It is difficult. | * Considered if the board for additional filters can fit the remain space in the combiner box. It is difficult. (Tanaka) |
Agenda/Minutes of the VIS Meeting on 2020/4/10
2020/4/10 14:00 -
Participants: Takahashi, Sato, Hirata, Ishizaki, Shoda, Tanaka, Aso, Fabian, Lucia
Progress report
Type-A
Past week report
Revising the Type-A installation procedure. (Takahashi)
Uploaded the mechanical assembly procedure for TF FR (Yaw and Vertical) with limit switch.Link to doc (Sato)
Plan for coming weeks
Type B
Past week report
Plan for coming weeks
Type-Bp
Past week report
- Assembled and tested the mirror rehanging jig. (Hirata)
Plan for coming weeks
Type-C
Past week report
Plan for coming weeks
VIS electronics
Past week report
- Considered if the board for additional filters can fit the remain space in the combiner box. It is difficult. (Tanaka)
- We should go to remake the board including original filter, additional filter, and pin assignment changer.
Plan for coming weeks
Safety
Discussion
Travel Plans
Next meeting
On 2020/4/17(Fri)