Agenda/Minutes of the VIS Meeting on 2020/5/1
2020/5/1 14:00 -
Participants:
Progress report
General
Type-A
Type B
Type-Bp
Type-C
- Modification of the IMMT2 suspension.
- The ghost beams are interfering with the pillar of suspension. The footprint should be changed.
Controls
Electronics
Post O3
- KAGRA went to the suspended mode from 28th April.
Tasks for the papers will be available after May 7th (actually May 11th) at earliest (Request).
- Papers
- Type-A: Lucia(Performance), Fujii(Sensor collection).
- Type-B: Fabian
- Towards O3c
Safety
Discussion
Travel Plans
Next meeting
On 2020/5/8(Fri)