Differences between revisions 1 and 10 (spanning 9 versions)
Revision 1 as of 2020-05-14 09:01:15
Size: 1194
Comment:
Revision 10 as of 2020-05-15 13:35:46
Size: 2363
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
2020/5/15 14:00 -  2020/5/15 14:00 -
Line 6: Line 6:
Participants:  Participants:
Line 15: Line 15:
 * Integrated 3D model of each Type-A tower.(JGW-D2011655)
  * According to the 3D model, it was found that the placement of the BF Dumper is offset by 5 degrees from the beam line (EX, EY only) [[attachment:ETM BF Dumper.pdf]]
Line 16: Line 19:
 * Type-B paper: I wrote a [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/TypeB/PaperTODOlist|TO DO list]] which roughtly works as an outline. Thank you Shoda-san for your comments!
  * In case it's not possible to measure the quality factors due to time constraints related to the pandemic, we can cite the prototype paper instead where similar measurements were reported.
  * Include long term drift observation of the optic orientation using the oplev.
  * Check what Terence did about inertial damping. He wrote good klog entries but there's still not enougn information to understand the detail. I will ask him once he becomes avilable to us sometime next month.
 * Inertial damping: I have been checking what Takanori did and I've been trying to adapt it to the case of SR2 using the Matlab simulation. I have questions but I'm not ready to ask. I will do it sometime soon via e-mail.
Line 21: Line 30:
 * KAGRA is under the suspended mode until 31st May.  * KAGRA is in the suspended mode until 31st May.
Line 23: Line 32:
 * O3c is still under discussion between LVK ([[https://paper.dropbox.com/doc/Plan-for-the-long-OR-brake--AxxlJFvK1IGJjqrG5nfdHfGXAQ-KqexeqMaCA7DITFGxA5ih|Plan]], [[https://www.dropbox.com/s/hoadb73fdyah02c/Post-O3%20task.xlsx?dl=0|Sheet]]).
Line 24: Line 34:
  * Type-A: Shoda(Mechanical), Lucia(Performance), Fujii(Sensor collection).   * Type-A: Shoda(Mechanics), Lucia(Performance), Fujii(Sensor collection).
Line 26: Line 36:
 * Towards O3c
  * [[https://paper.dropbox.com/doc/Plan-for-the-long-OR-brake--AxxlJFvK1IGJjqrG5nfdHfGXAQ-KqexeqMaCA7DITFGxA5ih|Plan]]
  * [[https://www.dropbox.com/s/hoadb73fdyah02c/Post-O3%20task.xlsx?dl=0|Sheet]]
Line 34: Line 41:
On 2020/5/22(Fri)  * On 2020/5/22(Fri)

Agenda/Minutes of the VIS Meeting on 2020/5/15

2020/5/15 14:00 -

Zoom Meeting

Participants:

Task list towards O4

Schedule afetr O3

Progress report

General

Type-A

  • Integrated 3D model of each Type-A tower.(JGW-D2011655)
    • According to the 3D model, it was found that the placement of the BF Dumper is offset by 5 degrees from the beam line (EX, EY only) ETM BF Dumper.pdf

Type-B

  • Type-B paper: I wrote a TO DO list which roughtly works as an outline. Thank you Shoda-san for your comments!

    • In case it's not possible to measure the quality factors due to time constraints related to the pandemic, we can cite the prototype paper instead where similar measurements were reported.
    • Include long term drift observation of the optic orientation using the oplev.
    • Check what Terence did about inertial damping. He wrote good klog entries but there's still not enougn information to understand the detail. I will ask him once he becomes avilable to us sometime next month.
  • Inertial damping: I have been checking what Takanori did and I've been trying to adapt it to the case of SR2 using the Matlab simulation. I have questions but I'm not ready to ask. I will do it sometime soon via e-mail.

Type-Bp

Type-C

Controls

Electronics

Post O3

  • KAGRA is in the suspended mode until 31st May.
  • Only measurements, which can be done remotely, are available (Request).

  • O3c is still under discussion between LVK (Plan, Sheet).

  • Papers
    • Type-A: Shoda(Mechanics), Lucia(Performance), Fujii(Sensor collection).
    • Type-B: Fabian

Safety

Discussion

Travel Plans

Next meeting

  • On 2020/5/22(Fri)

KAGRA/Subgroups/VIS/VISMinutes20200515 (last edited 2020-05-15 14:48:52 by RyutaroTakahashi)