Differences between revisions 1 and 2
Revision 1 as of 2020-05-14 09:01:15
Size: 1194
Comment:
Revision 2 as of 2020-05-15 10:49:27
Size: 1235
Comment:
Deletions are marked like this. Additions are marked like this.
Line 27: Line 27:
  * [[https://paper.dropbox.com/doc/Plan-for-the-long-OR-brake--AxxlJFvK1IGJjqrG5nfdHfGXAQ-KqexeqMaCA7DITFGxA5ih|Plan]]
  *
[[https://www.dropbox.com/s/hoadb73fdyah02c/Post-O3%20task.xlsx?dl=0|Sheet]]
  * O3c is still under discussion between LVK. ([[https://paper.dropbox.com/doc/Plan-for-the-long-OR-brake--AxxlJFvK1IGJjqrG5nfdHfGXAQ-KqexeqMaCA7DITFGxA5ih|Plan]], [[https://www.dropbox.com/s/hoadb73fdyah02c/Post-O3%20task.xlsx?dl=0|Sheet]])

Agenda/Minutes of the VIS Meeting on 2020/5/15

2020/5/15 14:00 -

Zoom Meeting

Participants:

Task list towards O4

Schedule afetr O3

Progress report

General

Type-A

Type-B

Type-Bp

Type-C

Controls

Electronics

Post O3

  • KAGRA is under the suspended mode until 31st May.
  • Only measurements, which can be done remotely, are available (Request).

  • Papers
    • Type-A: Shoda(Mechanical), Lucia(Performance), Fujii(Sensor collection).
    • Type-B: Fabian
  • Towards O3c
    • O3c is still under discussion between LVK. (Plan, Sheet)

Safety

Discussion

Travel Plans

Next meeting

On 2020/5/22(Fri)

KAGRA/Subgroups/VIS/VISMinutes20200515 (last edited 2020-05-15 14:48:52 by RyutaroTakahashi)