Differences between revisions 1 and 9 (spanning 8 versions)
Revision 1 as of 2020-05-14 09:01:15
Size: 1194
Comment:
Revision 9 as of 2020-05-15 11:51:37
Size: 1453
Editor: naohisa.sato
Comment:
Deletions are marked like this. Additions are marked like this.
Line 15: Line 15:
  * Integrated 3D model of each Type-A tower.(JGW-D2011655)
   * According to the 3D model, it was found that the placement of the BF Dumper is offset by 5 degrees from the beam line (EX, EY only) [[attachment:ETM BF Dumper.pdf]]
Line 21: Line 24:
 * KAGRA is under the suspended mode until 31st May.  * KAGRA is in the suspended mode until 31st May.
Line 23: Line 26:
 * O3c is still under discussion between LVK ([[https://paper.dropbox.com/doc/Plan-for-the-long-OR-brake--AxxlJFvK1IGJjqrG5nfdHfGXAQ-KqexeqMaCA7DITFGxA5ih|Plan]], [[https://www.dropbox.com/s/hoadb73fdyah02c/Post-O3%20task.xlsx?dl=0|Sheet]]).
Line 24: Line 28:
  * Type-A: Shoda(Mechanical), Lucia(Performance), Fujii(Sensor collection).   * Type-A: Shoda(Mechanics), Lucia(Performance), Fujii(Sensor collection).
Line 26: Line 30:
 * Towards O3c
  * [[https://paper.dropbox.com/doc/Plan-for-the-long-OR-brake--AxxlJFvK1IGJjqrG5nfdHfGXAQ-KqexeqMaCA7DITFGxA5ih|Plan]]
  * [[https://www.dropbox.com/s/hoadb73fdyah02c/Post-O3%20task.xlsx?dl=0|Sheet]]
Line 34: Line 35:
On 2020/5/22(Fri)  * On 2020/5/22(Fri)

Agenda/Minutes of the VIS Meeting on 2020/5/15

2020/5/15 14:00 -

Zoom Meeting

Participants:

Task list towards O4

Schedule afetr O3

Progress report

General

Type-A

  • Integrated 3D model of each Type-A tower.(JGW-D2011655)
    • According to the 3D model, it was found that the placement of the BF Dumper is offset by 5 degrees from the beam line (EX, EY only) ETM BF Dumper.pdf

Type-B

Type-Bp

Type-C

Controls

Electronics

Post O3

  • KAGRA is in the suspended mode until 31st May.
  • Only measurements, which can be done remotely, are available (Request).

  • O3c is still under discussion between LVK (Plan, Sheet).

  • Papers
    • Type-A: Shoda(Mechanics), Lucia(Performance), Fujii(Sensor collection).
    • Type-B: Fabian

Safety

Discussion

Travel Plans

Next meeting

  • On 2020/5/22(Fri)

KAGRA/Subgroups/VIS/VISMinutes20200515 (last edited 2020-05-15 14:48:52 by RyutaroTakahashi)