Size: 1235
Comment:
|
Size: 1219
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 23: | Line 23: |
* O3c is still under discussion between LVK. ([[https://paper.dropbox.com/doc/Plan-for-the-long-OR-brake--AxxlJFvK1IGJjqrG5nfdHfGXAQ-KqexeqMaCA7DITFGxA5ih|Plan]], [[https://www.dropbox.com/s/hoadb73fdyah02c/Post-O3%20task.xlsx?dl=0|Sheet]]) | |
Line 26: | Line 27: |
* Towards O3c * O3c is still under discussion between LVK. ([[https://paper.dropbox.com/doc/Plan-for-the-long-OR-brake--AxxlJFvK1IGJjqrG5nfdHfGXAQ-KqexeqMaCA7DITFGxA5ih|Plan]], [[https://www.dropbox.com/s/hoadb73fdyah02c/Post-O3%20task.xlsx?dl=0|Sheet]]) |
Agenda/Minutes of the VIS Meeting on 2020/5/15
2020/5/15 14:00 -
Participants:
Progress report
General
Type-A
Type-B
Type-Bp
Type-C
Controls
Electronics
Post O3
- KAGRA is under the suspended mode until 31st May.
Only measurements, which can be done remotely, are available (Request).
- Papers
- Type-A: Shoda(Mechanical), Lucia(Performance), Fujii(Sensor collection).
- Type-B: Fabian
Safety
Discussion
Travel Plans
Next meeting
On 2020/5/22(Fri)