Size: 1215
Comment:
|
Size: 1453
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 15: | Line 15: |
* Integrated 3D model of each Type-A tower.(JGW-D2011655) * According to the 3D model, it was found that the placement of the BF Dumper is offset by 5 degrees from the beam line (EX, EY only) [[attachment:ETM BF Dumper.pdf]] |
|
Line 25: | Line 28: |
* Type-A: Shoda(Mechanical), Lucia(Performance), Fujii(Sensor collection). | * Type-A: Shoda(Mechanics), Lucia(Performance), Fujii(Sensor collection). |
Line 32: | Line 35: |
On 2020/5/22(Fri) | * On 2020/5/22(Fri) |
Agenda/Minutes of the VIS Meeting on 2020/5/15
2020/5/15 14:00 -
Participants:
Progress report
General
Type-A
- Integrated 3D model of each Type-A tower.(JGW-D2011655)
According to the 3D model, it was found that the placement of the BF Dumper is offset by 5 degrees from the beam line (EX, EY only) ETM BF Dumper.pdf
Type-B
Type-Bp
Type-C
Controls
Electronics
Post O3
- KAGRA is in the suspended mode until 31st May.
Only measurements, which can be done remotely, are available (Request).
- Papers
- Type-A: Shoda(Mechanics), Lucia(Performance), Fujii(Sensor collection).
- Type-B: Fabian
Safety
Discussion
Travel Plans
Next meeting
- On 2020/5/22(Fri)