Size: 2810
Comment:
|
Size: 3058
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
2020/5/22 14:00 - | 2020/5/22 14:00 - 15:30 |
Line 6: | Line 6: |
Participants: | Participants: Takahashi, Hirata, Fabian, Miyo, Sato, Shoda, Aso, Lucia, Tanaka |
Line 32: | Line 32: |
* Ordered the parts for test and prepare for the test. |
|
Line 43: | Line 45: |
* Peport (Please check attached file in kagra-seis): "KAGRA observation run: performance of the Type A suspensions" |
Agenda/Minutes of the VIS Meeting on 2020/5/22
2020/5/22 14:00 - 15:30
Participants: Takahashi, Hirata, Fabian, Miyo, Sato, Shoda, Aso, Lucia, Tanaka
Progress report
General
Type-A
Type-B
After a verbal report from Lucia last week I checked the condition of SR2: the control system couldn't bring the IP to its set point (klog entry 14381).
- On Monday Lucia and I came to the site.
- We realized coil-magnet actuation didn't move the IP but horizontal fishing rods did, so we suspected the electronics or cabling.
With Yamamoto-kun we went to the tunnel and realized the HPCD had broken down (entry 14394).
Thanks to Tomura-san's quick reaction we got a new HPCD and recovered the IP and the suspension (entry 14395).
I don't know what's the origin of the failure. It wasn't an actuation overload due to an earthquke because there was no earthquake (entry 14407).
A similar event happened to the BS IP on the 5th of May (entry 14404).
I have been measuring decay times of the SR2 suspension on Thursday and Friday from the control room (klog entry 14413). There are no final results to show yet.
I asked a few elementary questions about inertial damping (questions here). Thank you very much Takahashi-san and Terrence for their answers!
Type-Bp
Type-C
- Making the 3D model of IMMT2 suspension.
Controls
Electronics
- Ordered the parts for test and prepare for the test.
Post O3
- KAGRA is in the suspended mode until 31st May.
Only measurements, which can be done remotely, are available (Request).
- The site work towards O4 will be started from July at earliest.
Safety
Discussion
- Submission to JPS/ASJ Meeting.
- JPS Meeting: 14-17 Sep. Online, Deadline: 4 Jun.
- ASJ Meeting: 8-10 Sep. Online, Deadline: 9 Jun.
- Peport (Please check attached file in kagra-seis): "KAGRA observation run: performance of the Type A suspensions"
Travel Plans
Next meeting
- On 2020/5/29(Fri)