Agenda/Minutes of the VIS Meeting on 2020/7/3
2020/7/3 14:00 -
Participants:
Progress report
General
Type-A
Type-B
Type-Bp
Type-C
Controls
Electronics
Post O3
- Post Obs. tasks are still on going. RT model modification for SRs was carried out. Sensor correction for SRs and SR suspension update are planed in the next week.
Schedule towards O4 (Chart) was revised.
cf. Post Obs. task (Request), Task for O3c (Plan, Sheet), Task towards O4 (List).
Safety
Discussion
- Acceptance Test.
- Confirmation of ducts and flanges to be opened.
Travel Plans
- Takahashi (7/14-16)
Next meeting
- On 2020/7/10(Fri)