Size: 1790
Comment:
|
Size: 3295
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
2020/9/4 14:00 - | 2020/9/4 14:00 - 16:00 |
Line 6: | Line 6: |
Participants: | Participants: Takahashi, Miyo, Hirata, Fabian, Aso, Sato, Ishizaki, Shoda, Telence, Ikeda, Tanaka, Washimi |
Line 10: | Line 10: |
* [Miyo] I introduced about VIS system to Ikeda-san who is a software engineer. Now I'm considering what kind of works should VIS people ask Ikeda-san. According to Tomaru-san who is a boss of Ikeda-san, at first, Ikeda-san decided to prepare the Gitlab repository for KAGRA because KAGRA needs version control system for the userapps files which include core codes of KAGRA. After this preparation, I will ask Ikeda-san to work for some software upgrade in VIS. So, next week I will hold hands-on training about the RTmodel, Guardian, SDF, medm, and so on for Ikeda-san. |
|
Line 12: | Line 14: |
* IP fixing jig ([[https://www.dropbox.com/s/7ebufwb79xw9zt8/IP%20fix%20jig%20design_200819.pdf?dl=0|Design]]) * Fabian wrote a humble plan for assessing the SRM BF condition. The document with procedures has been updated: [[https://onedrive.live.com/?authkey=!AOLVVVKJ_Zpn-2c&cid=1447B05D5B571A84&id=1447B05D5B571A84!26691&parId=1447B05D5B571A84!26683&o=OneUp|link]]. * I'm almost finished with the corrections of the paper. * Next week I aim to go to the site to do some preparation work if possible. |
|
Line 14: | Line 21: |
[no progress] |
|
Line 16: | Line 25: |
Line 22: | Line 30: |
* [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11978|Replacement of TF blades]] * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11878|Wire gluing in PR3]] * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11534|Type-B remedying work]] |
* [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11978|Replacement of TF blades]]: New * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11878|Wire gluing in PR3]]: Training with the TAMA prototype * [[https://onedrive.live.com/?authkey=!AOLVVVKJ_Zpn-2c&cid=1447B05D5B571A84&id=1447B05D5B571A84!26691&parId=1447B05D5B571A84!26683&o=OneUp|Type-B remedying work]]: Revised |
Line 26: | Line 34: |
* Suggestion: The final form should be like "Inspection document" in products by a company. | |
Line 33: | Line 42: |
[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11889|Presentation slides]] |
Agenda/Minutes of the VIS Meeting on 2020/9/4
2020/9/4 14:00 - 16:00
Participants: Takahashi, Miyo, Hirata, Fabian, Aso, Sato, Ishizaki, Shoda, Telence, Ikeda, Tanaka, Washimi
Progress report
General
- [Miyo] I introduced about VIS system to Ikeda-san who is a software engineer. Now I'm considering what kind of works should VIS people ask Ikeda-san. According to Tomaru-san who is a boss of Ikeda-san, at first, Ikeda-san decided to prepare the Gitlab repository for KAGRA because KAGRA needs version control system for the userapps files which include core codes of KAGRA. After this preparation, I will ask Ikeda-san to work for some software upgrade in VIS. So, next week I will hold hands-on training about the RTmodel, Guardian, SDF, medm, and so on for Ikeda-san.
Type-A
Type-B
IP fixing jig (Design)
Fabian wrote a humble plan for assessing the SRM BF condition. The document with procedures has been updated: link.
- I'm almost finished with the corrections of the paper.
- Next week I aim to go to the site to do some preparation work if possible.
Type-Bp
Type-C
[no progress]
Controls
Electronics
Towards O4
- KAGRA is in "RSE Trial" now.
- Procedure documents.
Wire gluing in PR3: Training with the TAMA prototype
Type-B remedying work: Revised
Acceptance Test (Wiki page).
- Suggestion: The final form should be like "Inspection document" in products by a company.
Schedule towards O4 (Chart).
cf. Post Obs. task (Request), Task for O3c (Plan, Sheet), Task towards O4 (List)
Safety
Discussion
- [Terrence] New features for the suspensions, type-A and type-B, as pre-O4 upgrades (III).
Travel Plans
Next meeting
- On 2020/9/11(Fri)