Differences between revisions 1 and 5 (spanning 4 versions)
Revision 1 as of 2020-09-03 10:16:04
Size: 1790
Comment:
Revision 5 as of 2020-09-04 10:50:31
Size: 2047
Comment:
Deletions are marked like this. Additions are marked like this.
Line 12: Line 12:
 * IP fixing jig ([[https://www.dropbox.com/s/7ebufwb79xw9zt8/IP%20fix%20jig%20design_200819.pdf?dl=0|Design]])
Line 14: Line 15:
[no progress]
Line 23: Line 25:
  * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11878|Wire gluing in PR3]]   * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11878|Wire gluing in PR3]]: Training with the TAMA prototype
Line 26: Line 28:
  * Suggestion: The final form should be like "Inspection document" in products by a company.

Agenda/Minutes of the VIS Meeting on 2020/9/4

2020/9/4 14:00 -

Zoom Meeting

Participants:

Progress report

General

Type-A

Type-B

Type-Bp

Type-C

[no progress]

Controls

Electronics

Towards O4

cf. Post Obs. task (Request), Task for O3c (Plan, Sheet), Task towards O4 (List)

Safety

Discussion

  • [Terrence] New features for the suspensions, type-A and type-B, as pre-O4 upgrades (III).

Travel Plans

Next meeting

  • On 2020/9/11(Fri)

KAGRA/Subgroups/VIS/VISMinutes20200904 (last edited 2020-09-04 16:21:25 by RyutaroTakahashi)