Differences between revisions 1 and 8 (spanning 7 versions)
Revision 1 as of 2020-09-03 10:16:04
Size: 1790
Comment:
Revision 8 as of 2020-09-04 13:11:39
Size: 2436
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
2020/9/4 14:00 -  2020/9/4 14:00 -
Line 6: Line 6:
Participants:  Participants:
Line 12: Line 12:
 * IP fixing jig ([[https://www.dropbox.com/s/7ebufwb79xw9zt8/IP%20fix%20jig%20design_200819.pdf?dl=0|Design]])
 * Fabian wrote a humble plan for assessing the SRM BF condition. The document with procedures has been updated: [[https://onedrive.live.com/?authkey=!AOLVVVKJ_Zpn-2c&cid=1447B05D5B571A84&id=1447B05D5B571A84!26691&parId=1447B05D5B571A84!26683&o=OneUp|link]].
 * I'm almost finished with the corrections of the paper.
Line 14: Line 18:
[no progress]
Line 16: Line 22:
Line 22: Line 27:
  * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11978|Replacement of TF blades]]
  * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11878|Wire gluing in PR3]]
  * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11534|Type-B remedying work]]
  * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11978|Replacement of TF blades]]: New
  * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11878|Wire gluing in PR3]]: Training with the TAMA prototype
  * [[https://onedrive.live.com/?authkey=!AOLVVVKJ_Zpn-2c&cid=1447B05D5B571A84&id=1447B05D5B571A84!26691&parId=1447B05D5B571A84!26683&o=OneUp|Type-B remedying work]]: Revised
Line 26: Line 31:
  * Suggestion: The final form should be like "Inspection document" in products by a company.

Agenda/Minutes of the VIS Meeting on 2020/9/4

2020/9/4 14:00 -

Zoom Meeting

Participants:

Progress report

General

Type-A

Type-B

  • IP fixing jig (Design)

  • Fabian wrote a humble plan for assessing the SRM BF condition. The document with procedures has been updated: link.

  • I'm almost finished with the corrections of the paper.

Type-Bp

Type-C

[no progress]

Controls

Electronics

Towards O4

cf. Post Obs. task (Request), Task for O3c (Plan, Sheet), Task towards O4 (List)

Safety

Discussion

  • [Terrence] New features for the suspensions, type-A and type-B, as pre-O4 upgrades (III).

Travel Plans

Next meeting

  • On 2020/9/11(Fri)

KAGRA/Subgroups/VIS/VISMinutes20200904 (last edited 2020-09-04 16:21:25 by RyutaroTakahashi)