Agenda/Minutes of the VIS Meeting on 2020/9/4
2020/9/4 14:00 -
Participants:
Progress report
General
Type-A
Type-B
IP fixing jig (Design)
Type-Bp
Type-C
[no progress]
Controls
Electronics
Towards O4
- KAGRA is in "RSE Trial" now.
- Procedure documents.
Wire gluing in PR3: Training with the TAMA prototype
Acceptance Test (Wiki page).
- Suggestion: The final form should be like "Inspection document" in products by a company.
Schedule towards O4 (Chart).
cf. Post Obs. task (Request), Task for O3c (Plan, Sheet), Task towards O4 (List)
Safety
Discussion
- [Terrence] New features for the suspensions, type-A and type-B, as pre-O4 upgrades (III).
Travel Plans
Next meeting
- On 2020/9/11(Fri)