⇤ ← Revision 1 as of 2020-09-10 09:49:38
Size: 1930
Comment:
|
Size: 1942
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 10: | Line 10: |
* The VIS-CRY integration meeting is set at 13:30-14:00 just before the VIS meeting. | * The VIS-CRY integration meeting will be set at 13:30-14:00 weekly just before the VIS meeting. |
Agenda/Minutes of the VIS Meeting on 2020/9/11
2020/9/11 14:00 -
Participants:
Progress report
General
- The VIS-CRY integration meeting will be set at 13:30-14:00 weekly just before the VIS meeting.
Type-A
Type-B
Type-Bp
Type-C
Controls
Electronics
Towards O4
- KAGRA is in "RSE Trial" now.
- Procedure documents.
- Schedule of the preparation work.
Acceptance Test (Wiki page).
- Example of the form like "Inspection document".
Schedule towards O4 (Chart).
cf. Post Obs. task (Request), Task for O3c (Plan, Sheet), Task towards O4 (List)
Safety
Discussion
Travel Plans
Next meeting
- On 2020/9/18(Fri)