Differences between revisions 3 and 5 (spanning 2 versions)
Revision 3 as of 2020-09-10 09:52:45
Size: 1944
Comment:
Revision 5 as of 2020-09-10 10:50:17
Size: 2097
Comment:
Deletions are marked like this. Additions are marked like this.
Line 26: Line 26:
 * Schedule of the preparation work.  * Preparation work.
  * The preparation work will be started on Oct. 1st.
  * [[https://www.dropbox.com/s/fxeig8e8aicjnc4/Booth%20cleaning.pdf?dl=0|Schedule and assignment of personnel]]

Agenda/Minutes of the VIS Meeting on 2020/9/11

2020/9/11 14:00 -

Zoom Meeting

Participants:

Progress report

General

  • The VIS-CRY integration meeting will be set at 13:30-14:00 weekly just before the VIS meeting.

Type-A

Type-B

Type-Bp

Type-C

Controls

Electronics

Towards O4

cf. Post Obs. task (Request), Task for O3c (Plan, Sheet), Task towards O4 (List)

Safety

Discussion

Travel Plans

Next meeting

  • On 2020/9/18(Fri)

KAGRA/Subgroups/VIS/VISMinutes20200911 (last edited 2020-09-11 16:10:55 by RyutaroTakahashi)