Differences between revisions 4 and 6 (spanning 2 versions)
Revision 4 as of 2020-09-10 10:46:52
Size: 2113
Comment:
Revision 6 as of 2020-09-10 16:33:07
Size: 2186
Comment:
Deletions are marked like this. Additions are marked like this.
Line 26: Line 26:
 * Schedule of the preparation work.  * Preparation work.
Line 30: Line 30:
  * Example of the form in inspection document style.   * [[https://www.dropbox.com/s/z8geo0vmix4snwt/Acceptance%20Test%20Documentation.pdf?dl=0|Example of the form in inspection document style]].

Agenda/Minutes of the VIS Meeting on 2020/9/11

2020/9/11 14:00 -

Zoom Meeting

Participants:

Progress report

General

  • The VIS-CRY integration meeting will be set at 13:30-14:00 weekly just before the VIS meeting.

Type-A

Type-B

Type-Bp

Type-C

Controls

Electronics

Towards O4

cf. Post Obs. task (Request), Task for O3c (Plan, Sheet), Task towards O4 (List)

Safety

Discussion

Travel Plans

Next meeting

  • On 2020/9/18(Fri)

KAGRA/Subgroups/VIS/VISMinutes20200911 (last edited 2020-09-11 16:10:55 by RyutaroTakahashi)