2020/9/11 14:00 - | 2020/9/11 14:00 - |
Line 6: | Line 6: |
Participants: | Participants: |
Line 11: | Line 11: |
Line 13: | Line 14: |
=== Type B === Report for the week of the 7th of September 2020. * I finished the corrections of the Type-B paper. Mark is checking the final vesion and I will submit as soon as he is finished. * Miyo-kun, Ikeda-san and I went to the mine and did ballast mass inventory ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=14998|14998]]): * Fabian is in the process of checking roghly how much we will need. * We checked for rectangular ones for the top of IM, round ones for the top of BF and arch weights for IPs. * Pictures and the actual inventory are in a new album in Google Photos: [[https://photos.app.goo.gl/X2eaBxsZGaRHYAQK6|SR3 Remedying work after O3]]. * Pictures of the top of SR3 IM: [[https://photos.app.goo.gl/4XPFZhT1i8yNoTSQ9|IM_top_1]], [[https://photos.app.goo.gl/zCaGhGh3521xT9cw7|IM_top_2]], [[https://photos.app.goo.gl/KphJBYRTfdi65Szf7|IM_top_3]], [[https://photos.app.goo.gl/WQvYbXj3a7iXhPtq8|IM_top_4]], [[https://photos.app.goo.gl/JP95jUx5yVMh7uyF6|IM_top_5]], [[https://photos.app.goo.gl/Mm9vypUDD3oASgiV7|IM_top_6]]. We will likely need to replace thick ones by thinner ones with the same weight and then remove from opposite corners. * In the procedure document I wrote that we must measure the bouyancy displacement effect when we to the venting. '''Importanrt for the adjustment of the ballast masses in BS and SR3'''. * Before we did the pumping down with the contro on, so we only know the change in feedback signal. (I should use TF vales to calcilaye displacement.) * We should do it with the control off just to measure the displacement directly. * For SR3 and SRM I measured the resonant frequencies of IPs (klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15013|15013]]). * SRM IP looks fine. * SR3 IP requires adjustment, the resonant frequencies are relatively high and there's a large assymetry between L and T. We have very small arch weights to fix the assymetry. '''What's the TAMS300 experience?''' * I tried to assess the consequence of having ferromagnetic connectors close to magnets on top of SF (klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15011|15011]]): inconclusive results. * I haven't checked Sato-san's cable alternative proposal. |
|
Line 17: | Line 36: |
Line 31: | Line 49: |
* Schedule towards O4 ([[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11475|Chart]]). | * Schedule towards O4. * ([[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11475|Two cases]]). |
Agenda/Minutes of the VIS Meeting on 2020/9/11
2020/9/11 14:00 -
Participants:
Progress report
General
- The VIS-CRY integration meeting will be set at 13:30-14:00 weekly just before the VIS meeting.
Type-A
Type-B
Type B
Report for the week of the 7th of September 2020.
- I finished the corrections of the Type-B paper. Mark is checking the final vesion and I will submit as soon as he is finished.
Miyo-kun, Ikeda-san and I went to the mine and did ballast mass inventory (14998):
- Fabian is in the process of checking roghly how much we will need.
- We checked for rectangular ones for the top of IM, round ones for the top of BF and arch weights for IPs.
Pictures and the actual inventory are in a new album in Google Photos: SR3 Remedying work after O3.
Pictures of the top of SR3 IM: IM_top_1, IM_top_2, IM_top_3, IM_top_4, IM_top_5, IM_top_6. We will likely need to replace thick ones by thinner ones with the same weight and then remove from opposite corners.
In the procedure document I wrote that we must measure the bouyancy displacement effect when we to the venting. Importanrt for the adjustment of the ballast masses in BS and SR3.
- Before we did the pumping down with the contro on, so we only know the change in feedback signal. (I should use TF vales to calcilaye displacement.)
- We should do it with the control off just to measure the displacement directly.
For SR3 and SRM I measured the resonant frequencies of IPs (klog 15013).
- SRM IP looks fine.
SR3 IP requires adjustment, the resonant frequencies are relatively high and there's a large assymetry between L and T. We have very small arch weights to fix the assymetry. What's the TAMS300 experience?
I tried to assess the consequence of having ferromagnetic connectors close to magnets on top of SF (klog 15011): inconclusive results.
- I haven't checked Sato-san's cable alternative proposal.
Type-Bp
Type-C
Controls
Electronics
Towards O4
- KAGRA is in "RSE Trial" now.
- Procedure documents.
- Preparation work.
- The preparation work will be started on Oct. 1st.
Acceptance Test (Wiki page).
- Schedule towards O4.
(Two cases).
cf. Post Obs. task (Request), Task for O3c (Plan, Sheet), Task towards O4 (List)
Safety
Discussion
Travel Plans
Next meeting
- On 2020/9/18(Fri)