Differences between revisions 1 and 2
Revision 1 as of 2020-10-07 09:41:51
Size: 2133
Comment:
Revision 2 as of 2020-10-08 18:24:31
Size: 2215
Editor: naohisa.sato
Comment:
Deletions are marked like this. Additions are marked like this.
Line 11: Line 11:
 * MN oplev table design
 * design of new small hexagon(Cable bandling bellow BF)

Agenda/Minutes on 2020/10/9

Zoom Meeting

CRY+VIS Interface Meeting

13:30-

Participants:

  • Post O3 Upgrade portal

  • Schedule on ETMY.
  • MN oplev table design
  • design of new small hexagon(Cable bandling bellow BF)

VIS Meeting

14:00-

Participants:

Progress report

General

Type-A

Type-B

Type-Bp

Type-C

Controls

Electronics

Towards O4

Safety

Discussion

Travel Plans

The week from 10/12

  • Takahashi: 10/12-16
  • Sato: 10/12-16
  • Hirata: 10/12-16

The week from 10/19

  • Takahashi: 10/19-10/23

Next meeting

  • On 2020/10/16(Fri)

KAGRA/Subgroups/VIS/VISMinutes20201009 (last edited 2020-10-09 15:41:33 by RyutaroTakahashi)