Differences between revisions 11 and 12
Revision 11 as of 2020-10-09 15:27:11
Size: 3194
Comment:
Revision 12 as of 2020-10-09 15:36:24
Size: 3530
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
13:30- 13:40-14:10
Line 7: Line 7:
Participants: Participants: Takahashi, Ohashi, Shoda, Hagiwara, Hirata, Ikeda, Miyo, Sato, Oshio, Ushiba, Kimura, Akutsu, Aso, Miyoki
Line 16: Line 16:
14:00- 14:10-15:00
Line 18: Line 18:
Participants: Participants: Takahashi, Shoda, Ishizaki, Fabian, Hitrata, Iguchi, Miyo, Tanaka, Sato, Sugiyama, Terrence, Aso
Line 36: Line 36:
 * Confirmation of exchange cables function in the new combiner.
 * Only two channels are available in the 1U chassis.

Agenda/Minutes on 2020/10/9

Zoom Meeting

CRY+VIS Interface Meeting

13:40-14:10

Participants: Takahashi, Ohashi, Shoda, Hagiwara, Hirata, Ikeda, Miyo, Sato, Oshio, Ushiba, Kimura, Akutsu, Aso, Miyoki

  • Post O3 Upgrade portal

  • Schedule on ETMY.
    • 11/2: Opening the chambers (top and cross tube), Fixing the IP and filters, Disconnection of the cables. 11/3: Disconnection of the cryo-payload.
  • MN oplev table design
  • design of new small hexagon(Cable bandling bellow BF)Assy small hexagon for BF-CRYO.pdf

VIS Meeting

14:10-15:00

Participants: Takahashi, Shoda, Ishizaki, Fabian, Hitrata, Iguchi, Miyo, Tanaka, Sato, Sugiyama, Terrence, Aso

Progress report

General

Type-A

  • Clean-up of the IXV and IYV area.

Type-B

  • Clean-up of the BS and SR area.
  • Hirata-san asked for a quotation for 3 Top Filter keystone plates (for BS, SR3 and SR3 in case it's needed).
  • Fabian made progress in writing a document about LVDT card recovery. One more working day is needed.
  • We lost Hirose-san's lamps for checking cleanliness of mirrors. We'll keep looking for them.
  • We lost the medium capacity scale we used for ballast mass measurement. We need to buy one. I borrowed Miyoki-san's for a few days but he wants it back.

Type-Bp

Type-C

Controls

Electronics

  • Confirmation of exchange cables function in the new combiner.
  • Only two channels are available in the 1U chassis.

Towards O4

Safety

Discussion

[Terrence] Very short introduction to VISHack Slides

Travel Plans

The week from 10/12

  • Takahashi: 10/12-16
  • Sato: 10/12-16
  • Hirata: 10/12-16

The week from 10/19

  • Takahashi: 10/19-10/23

Next meeting

  • On 2020/10/16(Fri)

KAGRA/Subgroups/VIS/VISMinutes20201009 (last edited 2020-10-09 15:41:33 by RyutaroTakahashi)