Agenda/Minutes on 2020/10/9
CRY+VIS Interface Meeting
13:30-
Participants:
- Schedule on ETMY.
- MN oplev table design
design of new small hexagon(Cable bandling bellow BF)Assy small hexagon for BF-CRYO.pdf
VIS Meeting
14:00-
Participants:
Progress report
General
Type-A
Type-B
Type-Bp
Type-C
Controls
Electronics
Towards O4
- RSE Trial was extended to Oct. 12th.
- Preparation work was started.
- Schedule.
- Procedure documents.
- Criteria in the acceptance test.
Safety
Discussion
Travel Plans
The week from 10/12
- Takahashi: 10/12-16
- Sato: 10/12-16
- Hirata: 10/12-16
The week from 10/19
- Takahashi: 10/19-10/23
Next meeting
- On 2020/10/16(Fri)