Differences between revisions 3 and 14 (spanning 11 versions)
Revision 3 as of 2020-10-08 18:26:32
Size: 2264
Editor: naohisa.sato
Comment:
Revision 14 as of 2020-10-09 15:41:33
Size: 3544
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
13:30- 13:40-14:10
Line 7: Line 7:
Participants: Participants: Takahashi, Ohashi, Shoda, Hagiwara, Hirata, Ikeda, Miyo, Sato, Oshio, Ushiba, Kimura, Akutsu, Aso, Miyoki
Line 11: Line 11:
  * 11/2: Opening the chambers (top and cross tube), Fixing the IP and filters, Disconnection of the cables. 11/3: Disconnection of the cryo-payload.
Line 12: Line 13:
 * design of new small hexagon(Cable bandling bellow BF)[[attachment:Assy small hexagon for BF-CRYO.pdf]]   * Welding is not allowed in the tunnel. There are some ideas; gluing, flanges with extension, clamp to the view port.
Line 14: Line 16:
14:00- 14:10-15:00
Line 16: Line 18:
Participants: Participants: Takahashi, Shoda, Ishizaki, Fabian, Hitrata, Iguchi, Miyo, Tanaka, Sato, Sugiyama, Terrence, Aso
Line 21: Line 23:
 * Clean-up of the IXV and IYV area.
Line 22: Line 26:
 * Clean-up of the BS and SR area.
 * Hirata-san asked for a quotation for 3 Top Filter keystone plates (for BS, SR3 and SR3 in case it's needed).
 * Fabian made progress in writing a document about LVDT card recovery. One more working day is needed.
 * We lost Hirose-san's lamps for checking cleanliness of mirrors. We'll keep looking for them.
 * We lost the medium capacity scale we used for ballast mass measurement. We need to buy one. I borrowed Miyoki-san's for a few days but he wants it back.
Line 26: Line 36:
 * Confirmation of exchange cables function in the new combiner.
 * Only two channels are available in the 1U chassis.
Line 33: Line 45:
  * Turn-off for the power outage. Type-A/C: Takahashi, Type-B: Fabian, Type-Bp: Miyo
Line 47: Line 60:
[Terrence]
Very short introduction to VISHack
[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12125 | Slides]]

Agenda/Minutes on 2020/10/9

Zoom Meeting

CRY+VIS Interface Meeting

13:40-14:10

Participants: Takahashi, Ohashi, Shoda, Hagiwara, Hirata, Ikeda, Miyo, Sato, Oshio, Ushiba, Kimura, Akutsu, Aso, Miyoki

  • Post O3 Upgrade portal

  • Schedule on ETMY.
    • 11/2: Opening the chambers (top and cross tube), Fixing the IP and filters, Disconnection of the cables. 11/3: Disconnection of the cryo-payload.
  • MN oplev table design
    • Welding is not allowed in the tunnel. There are some ideas; gluing, flanges with extension, clamp to the view port.

VIS Meeting

14:10-15:00

Participants: Takahashi, Shoda, Ishizaki, Fabian, Hitrata, Iguchi, Miyo, Tanaka, Sato, Sugiyama, Terrence, Aso

Progress report

General

Type-A

  • Clean-up of the IXV and IYV area.

Type-B

  • Clean-up of the BS and SR area.
  • Hirata-san asked for a quotation for 3 Top Filter keystone plates (for BS, SR3 and SR3 in case it's needed).
  • Fabian made progress in writing a document about LVDT card recovery. One more working day is needed.
  • We lost Hirose-san's lamps for checking cleanliness of mirrors. We'll keep looking for them.
  • We lost the medium capacity scale we used for ballast mass measurement. We need to buy one. I borrowed Miyoki-san's for a few days but he wants it back.

Type-Bp

Type-C

Controls

Electronics

  • Confirmation of exchange cables function in the new combiner.
  • Only two channels are available in the 1U chassis.

Towards O4

Safety

Discussion

[Terrence] Very short introduction to VISHack Slides

Travel Plans

The week from 10/12

  • Takahashi: 10/12-16
  • Sato: 10/12-16
  • Hirata: 10/12-16

The week from 10/19

  • Takahashi: 10/19-10/23

Next meeting

  • On 2020/10/16(Fri)

KAGRA/Subgroups/VIS/VISMinutes20201009 (last edited 2020-10-09 15:41:33 by RyutaroTakahashi)