Differences between revisions 3 and 4
Revision 3 as of 2020-10-08 18:26:32
Size: 2264
Editor: naohisa.sato
Comment:
Revision 4 as of 2020-10-08 21:48:39
Size: 2417
Comment:
Deletions are marked like this. Additions are marked like this.
Line 11: Line 11:
  * 10/2-3: Opening the chambers (top and cross tube), Fixing the IP and filters, Disconnection of the cables. 10/4: Disconnection of the cryo-payload.

Agenda/Minutes on 2020/10/9

Zoom Meeting

CRY+VIS Interface Meeting

13:30-

Participants:

  • Post O3 Upgrade portal

  • Schedule on ETMY.
    • 10/2-3: Opening the chambers (top and cross tube), Fixing the IP and filters, Disconnection of the cables. 10/4: Disconnection of the cryo-payload.
  • MN oplev table design
  • design of new small hexagon(Cable bandling bellow BF)Assy small hexagon for BF-CRYO.pdf

VIS Meeting

14:00-

Participants:

Progress report

General

Type-A

Type-B

Type-Bp

Type-C

Controls

Electronics

Towards O4

Safety

Discussion

Travel Plans

The week from 10/12

  • Takahashi: 10/12-16
  • Sato: 10/12-16
  • Hirata: 10/12-16

The week from 10/19

  • Takahashi: 10/19-10/23

Next meeting

  • On 2020/10/16(Fri)

KAGRA/Subgroups/VIS/VISMinutes20201009 (last edited 2020-10-09 15:41:33 by RyutaroTakahashi)