[Terrence]
Very short introduction to VISHack
[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12125 | Slides]]

Agenda/Minutes on 2020/10/9

Zoom Meeting

CRY+VIS Interface Meeting

13:30-

Participants:

  • Post O3 Upgrade portal

  • Schedule on ETMY.
    • 11/2-3: Opening the chambers (top and cross tube), Fixing the IP and filters, Disconnection of the cables. 11/4: Disconnection of the cryo-payload.
  • MN oplev table design
  • design of new small hexagon(Cable bandling bellow BF)Assy small hexagon for BF-CRYO.pdf

VIS Meeting

14:00-

Participants:

Progress report

General

Type-A

  • Clean-up of the IXV and IYV area.

Type-B

  • Clean-up of the BS and SR area.
  • Hirata-san asked for a quotation for 3 Top Filter keystone plates (for BS, SR3 and SR3 in case it's needed).
  • Fabian made progress in writing a document about LVDT card recovery. One more working day is needed.
  • We lost Hirose-san's lamps for checking cleanliness of mirrors. We'll keep looking for them.
  • We lost the medium capacity scale we used for ballast mass measurement. We need to buy one. I borrowed Miyoki-san's for a few days but he wants it back.

Type-Bp

Type-C

Controls

Electronics

Towards O4

Safety

Discussion

[Terrence] Very short introduction to VISHack Slides

Travel Plans

The week from 10/12

  • Takahashi: 10/12-16
  • Sato: 10/12-16
  • Hirata: 10/12-16

The week from 10/19

  • Takahashi: 10/19-10/23

Next meeting

  • On 2020/10/16(Fri)