Agenda/Minutes on 2020/12/25
CRY+VIS Interface Meeting
13:30-
Participants:
- Schedule: Connection of ITMX after 1/12. Update of schedule for ITMY.
- Flow chart: Two-step commissioning in vacuum.
- Acceptance check items: Making the document for cryo-payload.
- Jig for FC painting: Ordered.
PF actuator: Measurement of coefficients --> calculation of the noise (by the end of Jan.).
VIS Meeting
14:00-
Participants:
Progress report
General
Type-A
Type-B
Type-Bp
Type-C
Controls
Electronics
Towards O4
- Type-B remedy work is on going.
- Preparation for IXV is on going.
- Schedule.
- Procedure documents.
- Criteria in the acceptance test.
Safety
Discussion
Travel Plans
The week from 12/28
The week from 1/4
- Takahashi: 1/4-8
- Sato: 1/4-8
- Hirata: 1/4-8
- Yano: 1/4-8
Next meeting
- On 2020/1/8(Fri)