Activities in this week
takafumi.ushiba, Friday, VIS/IX, Comment to Cabling for cryo-payload (Click here to view original report: 15860), 15864
ryutaro.takahashi, Friday, VIS/IX, Comment to Cabling for cryo-payload (Click here to view original report: 15860), 15866
kouseki.miyo, Sunday, VIS/General, Some suspensions are not SAFE., 15868
fabian.arellano, Sunday, VIS/PR3, Comment to Gluing the mirror wire. (Click here to view original report: 15844), 15869
kouseki.miyo, Sunday, VIS/General, ISOLATED state is available with only LVDTs not blended sensors., 15871
Agenda/Minutes on 2021/2/5
CRY+VIS Interface Meeting
13:30-14:00
Participants:
Copy from previous meeting
- Schedule for IX: Connection is scheduled in the week of 2/8.
- Schedule for IY: Disconnection was scheduled on 3/11.
- Schedule for EX: Connection was scheduled in the week of 3/15.
- Corrugate tube fixing jig: Re-measurement is planed in 2/26-3/1 at IYV.
- Commissioning in vacuum: Two phased commissioning will be tried in IX at beginning. After that, one phase is default.
- Acceptance check: Cryo-payload in IX and Type-A tower in EY are on going.
- Jig for FC painting: Under manufacturing.
- PF actuator: by the end of January.
VIS Meeting
14:00-16:00
Participants:
Progress report
General
Type-A
Type-B
Type-Bp
Type-C
Controls
Electronics
Towards O4
- Type-B/Bp remedy work is on going.
- Installation of Type-A is on going in EY.
- Schedule.
- Procedure documents.
- Criteria in the acceptance test.
Safety
Discussion
Travel Plans