Differences between revisions 1 and 30 (spanning 29 versions)
Revision 1 as of 2021-02-08 07:41:04
Size: 1923
Editor: KousekiMiyo
Comment:
Revision 30 as of 2021-02-09 07:34:39
Size: 4883
Editor: KousekiMiyo
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
= Agenda/Minutes on 2021/2/5 = '''CRY/Cryo-payload EX'''
 * ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15878|15878]]) EX payload upgrade , __takafumi.ushiba__
  * ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15948|15948]]) Comment, __takafumi.ushiba__
'''CRY/Cryostat IY'''
 * ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15951|15951]]) IYC cooling restart , __takayuki.tomaru__
'''VIS/EY'''
 * ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15932|15932]]) Setup of F3 , __ryutaro.takahashi__
  * ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15936|15936]]) Comment, __kouseki.miyo__
 * '''VIS/EY'''
 * ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15950|15950]]) Setup of F2 , __ryutaro.takahashi__
 * '''VIS/EY'''
 * (!) Monday ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15959|15959]]) Connection between F3 and F2 , __naohisa.satou__
 * '''VIS/General'''
 * ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15641|15641]]) Support for common model files: Installation on Type-A (ETMX, ETMY, ITMX) and Type-B (SRM, SR2) , __satoru.ikeda__
  * ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15938|15938]]) Comment, __kouseki.miyo__
 * '''VIS/General'''
 * ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15737|15737]]) We investigated the network connection. , __satoru.ikeda__
  * (!) Monday ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15956|15956]]) Comment, __satoru.ikeda__
 * '''VIS/General'''
 * (!) Monday ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15958|15958]]) About Picomotor's 24-hour operation , __satoru.ikeda__
 * '''VIS/PR3'''
 * ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15844|15844]]) Gluing the mirror wire. , __fabian.arellano__
  * ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15941|15941]]) Comment, __fabian.arellano__
 * '''VIS/PR3'''
 * ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15889|15889]]) Traverser motor test and cabling. , __fabian.arellano__
  * ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15944|15944]]) Comment, __satoru.ikeda__
 * '''VIS/PRM'''
 * ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=9449|9449]]) PRM glitch investigation: , __koki.okutomi__
  * (!) Tuesday ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15960|15960]]) Comment, __kouseki.miyo__
 * '''VIS/PRM'''
 * (!) Monday ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15957|15957]]) Checking the operation of PRM's Picomotor PRM_BF and PRM_IM , __satoru.ikeda__
 * '''VIS/SR2'''
 * ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15684|15684]]) Support for common Payload model files: Payload of Type-B (SR2) is supported to PAYLOAD_MASTER. , __satoru.ikeda__
  * ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15937|15937]]) Comment, __kouseki.miyo__
 * '''VIS/SR3'''
 * ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15928|15928]]) Oplev installation and alignment recovery. , __fabian.arellano__
  * ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15935|15935]]) Comment, __kouseki.miyo__
  * '''VIS/SR3'''
 * (!) Monday ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15953|15953]]) Comment , __fabian.arellano__

= Agenda/Minutes on 2021/2/12 =

Activities in this week

CRY/Cryo-payload EX

  • (15878) EX payload upgrade , takafumi.ushiba

    • (15948) Comment, takafumi.ushiba

CRY/Cryostat IY

  • (15951) IYC cooling restart , takayuki.tomaru

VIS/EY

  • (15932) Setup of F3 , ryutaro.takahashi

    • (15936) Comment, kouseki.miyo

  • VIS/EY

  • (15950) Setup of F2 , ryutaro.takahashi

  • VIS/EY

  • (!) Monday (15959) Connection between F3 and F2 , naohisa.satou

  • VIS/General

  • (15641) Support for common model files: Installation on Type-A (ETMX, ETMY, ITMX) and Type-B (SRM, SR2) , satoru.ikeda

    • (15938) Comment, kouseki.miyo

  • VIS/General

  • (15737) We investigated the network connection. , satoru.ikeda

    • (!) Monday (15956) Comment, satoru.ikeda

  • VIS/General

  • (!) Monday (15958) About Picomotor's 24-hour operation , satoru.ikeda

  • VIS/PR3

  • (15844) Gluing the mirror wire. , fabian.arellano

    • (15941) Comment, fabian.arellano

  • VIS/PR3

  • (15889) Traverser motor test and cabling. , fabian.arellano

    • (15944) Comment, satoru.ikeda

  • VIS/PRM

  • (9449) PRM glitch investigation: , koki.okutomi

    • (!) Tuesday (15960) Comment, kouseki.miyo

  • VIS/PRM

  • (!) Monday (15957) Checking the operation of PRM's Picomotor PRM_BF and PRM_IM , satoru.ikeda

  • VIS/SR2

  • (15684) Support for common Payload model files: Payload of Type-B (SR2) is supported to PAYLOAD_MASTER. , satoru.ikeda

    • (15937) Comment, kouseki.miyo

  • VIS/SR3

  • (15928) Oplev installation and alignment recovery. , fabian.arellano

    • (15935) Comment, kouseki.miyo

    • VIS/SR3

  • (!) Monday (15953) Comment , fabian.arellano

Agenda/Minutes on 2021/2/12

Zoom Meeting

CRY+VIS Interface Meeting

13:30-14:00

Participants:

Post O3 Upgrade portal

VIS Meeting

14:00-14:40

Participants:

Progress report

General

Type-A

Type-B

Type-Bp

Type-C

Controls

Electronics

Towards O4

Safety

Discussion

Travel Plans

The week from 2/8

  • Takahashi: 2/8-12
  • Sato: 2/8-12
  • Hirata: 2/8-12
  • Yano: 2/8-12

The week from 2/15

  • Takahashi: 2/15-19
  • Sato: 2/15-19
  • Hirata: 2/15-19
  • Yano: 2/15-19

Next meeting

  • On 2020/2/12(Fri)

KAGRA/Subgroups/VIS/VISMinutes20210212 (last edited 2021-02-12 21:04:59 by RyutaroTakahashi)