Differences between revisions 17 and 19 (spanning 2 versions)
Revision 17 as of 2021-02-08 08:27:55
Size: 3907
Editor: KousekiMiyo
Comment:
Revision 19 as of 2021-02-08 08:30:20
Size: 3907
Editor: KousekiMiyo
Comment:
No differences found!

Activities in this week

  • VIS/General, satoru.ikeda: Support for common model files: Installation on Type-A (ETMX, ETMY, ITMX) and Type-B (SRM, SR2) (15641)

    • (!) Friday kouseki.miyo: Comment (15938)

  • VIS/SR2, satoru.ikeda: Support for common Payload model files: Payload of Type-B (SR2) is supported to PAYLOAD_MASTER. (15684)

    • (!) Friday kouseki.miyo: Comment (15937)

  • VIS/PR3, fabian.arellano: Gluing the mirror wire. (15844)

    • (!) Friday fabian.arellano: Comment (15941)

  • CRY/Cryo-payload EX, takafumi.ushiba: EX payload upgrade (15878)

    • (!) Friday takafumi.ushiba: Comment (15948)

  • VIS/PR3, fabian.arellano: Traverser motor test and cabling. (15889)

    • (!) Friday satoru.ikeda: Comment (15944)

  • VIS/SR3, fabian.arellano: Oplev installation and alignment recovery. (15928)

    • (!) Friday kouseki.miyo: Comment (15935)

  • VIS/EY, ryutaro.takahashi: Setup of F3 (15932)

    • (!) Friday kouseki.miyo: Comment (15936)

  • VIS/EY, (!) Saturday ryutaro.takahashi: Setup of F2 (15950)

  • CRY/Cryostat IY, (!) Saturday takayuki.tomaru: IYC cooling restart (15951)

Agenda/Minutes on 2021/2/5

Zoom Meeting

CRY+VIS Interface Meeting

13:30-14:00

Participants:

Post O3 Upgrade portal

VIS Meeting

14:00-14:40

Participants:

Progress report

General

Type-A

Type-B

Type-Bp

Type-C

Controls

Electronics

Towards O4

Safety

Discussion

Travel Plans

The week from 2/8

  • Takahashi: 2/8-12
  • Sato: 2/8-12
  • Hirata: 2/8-12
  • Yano: 2/8-12

The week from 2/15

  • Takahashi: 2/15-19
  • Sato: 2/15-19
  • Hirata: 2/15-19
  • Yano: 2/15-19

Next meeting

  • On 2020/2/12(Fri)

KAGRA/Subgroups/VIS/VISMinutes20210212 (last edited 2021-02-12 21:04:59 by RyutaroTakahashi)