Differences between revisions 23 and 24
Revision 23 as of 2021-02-09 07:04:06
Size: 4603
Editor: KousekiMiyo
Comment:
Revision 24 as of 2021-02-09 07:04:40
Size: 4588
Editor: KousekiMiyo
Comment:
Deletions are marked like this. Additions are marked like this.
Line 25: Line 25:
 *  '''VIS/SR3''', (!) Monday __fabian.arellano__: Comment ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15953|15953]])   * (!) Monday __fabian.arellano__: Comment ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15953|15953]])

Activities in this week

  • CRY/Cryo-payload EX, takafumi.ushiba: EX payload upgrade (15878)

    • takafumi.ushiba: Comment (15948)

  • CRY/Cryostat IY, takayuki.tomaru: IYC cooling restart (15951)

  • VIS/EY, ryutaro.takahashi: Setup of F3 (15932)

    • kouseki.miyo: Comment (15936)

  • VIS/EY, ryutaro.takahashi: Setup of F2 (15950)

  • VIS/EY, (!) Monday naohisa.satou: Connection between F3 and F2 (15959)

  • VIS/General, satoru.ikeda: Support for common model files: Installation on Type-A (ETMX, ETMY, ITMX) and Type-B (SRM, SR2) (15641)

    • kouseki.miyo: Comment (15938)

  • VIS/General, satoru.ikeda: We investigated the network connection. (15737)

    • (!) Monday satoru.ikeda: Comment (15956)

  • VIS/General, (!) Monday satoru.ikeda: About Picomotor's 24-hour operation (15958)

  • VIS/PR3, fabian.arellano: Gluing the mirror wire. (15844)

    • fabian.arellano: Comment (15941)

  • VIS/PR3, fabian.arellano: Traverser motor test and cabling. (15889)

    • satoru.ikeda: Comment (15944)

  • VIS/PRM, (!) Monday satoru.ikeda: Checking the operation of PRM's Picomotor PRM_BF and PRM_IM (15957)

  • VIS/SR2, satoru.ikeda: Support for common Payload model files: Payload of Type-B (SR2) is supported to PAYLOAD_MASTER. (15684)

    • kouseki.miyo: Comment (15937)

  • VIS/SR3, fabian.arellano: Oplev installation and alignment recovery. (15928)

    • kouseki.miyo: Comment (15935)

    • (!) Monday fabian.arellano: Comment (15953)

Agenda/Minutes on 2021/2/12

Zoom Meeting

CRY+VIS Interface Meeting

13:30-14:00

Participants:

Post O3 Upgrade portal

VIS Meeting

14:00-14:40

Participants:

Progress report

General

Type-A

Type-B

Type-Bp

Type-C

Controls

Electronics

Towards O4

Safety

Discussion

Travel Plans

The week from 2/8

  • Takahashi: 2/8-12
  • Sato: 2/8-12
  • Hirata: 2/8-12
  • Yano: 2/8-12

The week from 2/15

  • Takahashi: 2/15-19
  • Sato: 2/15-19
  • Hirata: 2/15-19
  • Yano: 2/15-19

Next meeting

  • On 2020/2/12(Fri)

KAGRA/Subgroups/VIS/VISMinutes20210212 (last edited 2021-02-12 21:04:59 by RyutaroTakahashi)