Line 4: | Line 4: |
'''CRY/Cryo-payload EX''' * EX payload upgrade ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15878|15878]]), __takafumi.ushiba__ * Comment ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15948|15948]]), __takafumi.ushiba__ |
== VIS/General == * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15737|15737]] We investigated the network connection. , __satoru.ikeda__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15956|15956]] Comment, __satoru.ikeda__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15958|15958]] About Picomotor's 24-hour operation , __satoru.ikeda__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15965|15965]] Integration of Cryo Payload Phytron motor driver into MEDM , __satoru.ikeda__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15983|15983]] I posted this by mistake. , __satoru.ikeda__ |
Line 8: | Line 11: |
'''CRY/Cryostat IY''' * IYC cooling restart ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15951|15951]]), __takayuki.tomaru__ |
== VIS/EY == '''Summary''': Setup of the F2 stage in EY: installation of suspension wire, cabling, calibration of LVDT, check of FR range, tuning * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15950|15950]] Setup of F2 , __ryutaro.takahashi__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15959|15959]] Connection between F3 and F2 , __naohisa.satou__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15972|15972]] Cabling between F3 and F2 , __naohisa.satou__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15982|15982]] Setup of F2 , __ryutaro.takahashi__ * (!) Thursday [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15993|15993]] Setup of F2 , __ryutaro.takahashi__ == VIS/IX == '''Summary''': Connection of the cryo-payload in IX, mounted the geophones onto the IP in IX, and compressed the F0 blades in IX. |
Line 11: | Line 21: |
'''VIS/EY''' * Setup of F3 ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15932|15932]]), __ryutaro.takahashi__ * Comment ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15936|15936]]), __kouseki.miyo__ |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15968|15968]] Connection to cryo-payload , __ryutaro.takahashi__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15974|15974]] Comment, __ryutaro.takahashi__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15968|15968]] Connection to cryo-payload , __ryutaro.takahashi__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15981|15981]] Setup of pre-isolator , __ryutaro.takahashi__ |
Line 15: | Line 26: |
'''VIS/EY''' * Setup of F2 ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15950|15950]]), __ryutaro.takahashi__ * (!) Monday Connection between F3 and F2 ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15959|15959]]), __naohisa.satou__ |
== VIS/MCE == * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15987|15987]] MCe oplev , __tomotada.akutsu__ |
Line 19: | Line 29: |
'''VIS/General''' * Support for common model files: Installation on Type-A (ETMX, ETMY, ITMX) and Type-B (SRM, SR2) ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15641|15641]]), __satoru.ikeda__ * Comment ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15938|15938]]), __kouseki.miyo__ * We investigated the network connection. ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15737|15737]]), __satoru.ikeda__ * (!) Monday Comment ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15956|15956]]), __satoru.ikeda__ * (!) Monday About Picomotor's 24-hour operation ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15958|15958]]), __satoru.ikeda__ |
== VIS/PRM == '''Summary''': |
Line 26: | Line 32: |
'''VIS/PR3''' * Gluing the mirror wire. ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15844|15844]]), __fabian.arellano__ * Comment ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15941|15941]]), __fabian.arellano__ * Traverser motor test and cabling. ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15889|15889]]), __fabian.arellano__ * Comment ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15944|15944]]), __satoru.ikeda__ |
(1) Miyo fixed the swapped cabling on the BF-damper for PRM with Nakagaki-san, and after that, the noise coupling of the transfer function at higher frequency is decreased to the same behavior of other PR suspensions (15994). |
Line 32: | Line 34: |
'''VIS/PRM''' * PRM glitch investigation: ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=9449|9449]]), __koki.okutomi__ * (!) Tuesday Comment ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15960|15960]]), __kouseki.miyo__ * (!) Monday Checking the operation of PRM's Picomotor PRM_BF and PRM_IM ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15957|15957]]), __satoru.ikeda__ |
(2) Ikeda-san touched the picomotor of PRM for his first operation (15957) before measure the calibration factor between picomotor and OSEM. |
Line 37: | Line 36: |
'''VIS/SR2''' * Support for common Payload model files: Payload of Type-B (SR2) is supported to PAYLOAD_MASTER. ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15684|15684]]), __satoru.ikeda__ * Comment ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15937|15937]]), __kouseki.miyo__ |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=9449|9449]] PRM glitch investigation: , __koki.okutomi__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15960|15960]] Comment, __kouseki.miyo__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15988|15988]] Comment , __kouseki.miyo__ * (!) Thursday [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15994|15994]] Comment , __kouseki.miyo__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15957|15957]] Checking the operation of PRM's Picomotor PRM_BF and PRM_IM , __satoru.ikeda__ |
Line 41: | Line 42: |
'''VIS/SR3''' * Oplev installation and alignment recovery. ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15928|15928]]), __fabian.arellano__ * Comment ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15935|15935]]), __kouseki.miyo__ * (!) Monday Comment ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15953|15953]]), __fabian.arellano__ |
== VIS/PR3 == '''Summary''': Ikeda-san tested the picomotor operation and measured rough calibration value for PR3-IM picomotor (15977). During the test for BF picomotor, it was stucked (15976). So we need open the top chamber to fix that. * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15977|15977]] PR3 IM PITCH, ROLL, YAW's Picomotor is operated to measure the travel and drive range , __satoru.ikeda__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15976|15976]] Picomotor of PR3_BF_T(Motor2) got stuck , __satoru.ikeda__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15979|15979]] Comment, __satoru.ikeda__ == VIS/SR3 == * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15928|15928]] Oplev installation and alignment recovery. , __fabian.arellano__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15953|15953]] Comment, __fabian.arellano__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15963|15963]] IM ballast mass adjustment , __fabian.arellano__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15975|15975]] Comment, __fabian.arellano__ * (!) Thursday [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15990|15990]] Comment , __fabian.arellano__ * (!) Thursday [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15991|15991]] Comment , __fabian.arellano__ |
Line 50: | Line 61: |
13:30-14:00 | 13:30- |
Line 56: | Line 67: |
* Schedule for IX: Release is scheduled on 2/18. * Schedule for IY: Disconnection is scheduled on 3/11. * Schedule for EX: Connection is scheduled in the week of 3/15. * Corrugate tube fixing jig: Re-measurement is planed in 2/26-3/1 at IYV. * Commissioning in air: * Commissioning in vacuum: * Acceptance check: Cryo-payload in IX and Type-A tower in EY are on going. * PF actuator: Dead line depends on the schedule of commissioning. * Jig for FC painting: Delivered. |
|
Line 57: | Line 78: |
14:00-14:40 | 14:00- |
Line 63: | Line 84: |
[Miyo] See [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/VISMinutes20210212#VIS.2BAC8-General|Activities/General]] |
|
Line 64: | Line 87: |
* Setup of the F2 stage in EY: installation of suspension wire, cabling, calibration of LVDT, check of FR range, tuning * Connection of the cryo-payload in IX. * Mounted the geophones onto the IP in IX. * Compressed the F0 blades in IX. |
|
Line 68: | Line 95: |
[Miyo] See [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/VISMinutes20210212#VIS.2BAC8-PR3|PR3]] [Miyo] See [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/VISMinutes20210212#VIS.2BAC8-PRM|PRM]] |
|
Line 69: | Line 100: |
=== Controls === === Electronics === |
|
Line 70: | Line 103: |
=== Controls === === Electronics === |
|
Line 90: | Line 120: |
* [Ikeda] How to rescue the stucked picomotor named BF-T for PR3. [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15976|klog#15976]] |
|
Line 91: | Line 123: |
The week from 2/8 * Takahashi: 2/8-12 * Sato: 2/8-12 * Hirata: 2/8-12 * Yano: 2/8-12 |
|
Line 105: | Line 130: |
The week from 2/22 * Takahashi: 2/23-26 * Sato: 2/22-26 * Hirata: 2/23-26 * Yano: 2/22-26 |
|
Line 106: | Line 138: |
* On 2020/2/12(Fri) | * On 2020/2/19(Fri) |
Contents
Activities in this week
VIS/General
15737 We investigated the network connection. , satoru.ikeda
15956 Comment, satoru.ikeda
15958 About Picomotor's 24-hour operation , satoru.ikeda
15965 Integration of Cryo Payload Phytron motor driver into MEDM , satoru.ikeda
15983 I posted this by mistake. , satoru.ikeda
VIS/EY
Summary: Setup of the F2 stage in EY: installation of suspension wire, cabling, calibration of LVDT, check of FR range, tuning
15950 Setup of F2 , ryutaro.takahashi
15959 Connection between F3 and F2 , naohisa.satou
15972 Cabling between F3 and F2 , naohisa.satou
15982 Setup of F2 , ryutaro.takahashi
Thursday 15993 Setup of F2 , ryutaro.takahashi
VIS/IX
Summary: Connection of the cryo-payload in IX, mounted the geophones onto the IP in IX, and compressed the F0 blades in IX.
15968 Connection to cryo-payload , ryutaro.takahashi
15974 Comment, ryutaro.takahashi
15968 Connection to cryo-payload , ryutaro.takahashi
15981 Setup of pre-isolator , ryutaro.takahashi
VIS/MCE
15987 MCe oplev , tomotada.akutsu
VIS/PRM
Summary:
(1) Miyo fixed the swapped cabling on the BF-damper for PRM with Nakagaki-san, and after that, the noise coupling of the transfer function at higher frequency is decreased to the same behavior of other PR suspensions (15994).
(2) Ikeda-san touched the picomotor of PRM for his first operation (15957) before measure the calibration factor between picomotor and OSEM.
9449 PRM glitch investigation: , koki.okutomi
15957 Checking the operation of PRM's Picomotor PRM_BF and PRM_IM , satoru.ikeda
VIS/PR3
Summary: Ikeda-san tested the picomotor operation and measured rough calibration value for PR3-IM picomotor (15977). During the test for BF picomotor, it was stucked (15976). So we need open the top chamber to fix that.
15977 PR3 IM PITCH, ROLL, YAW's Picomotor is operated to measure the travel and drive range , satoru.ikeda
15976 Picomotor of PR3_BF_T(Motor2) got stuck , satoru.ikeda
15979 Comment, satoru.ikeda
VIS/SR3
15928 Oplev installation and alignment recovery. , fabian.arellano
15953 Comment, fabian.arellano
15963 IM ballast mass adjustment , fabian.arellano
Agenda/Minutes on 2021/2/12
CRY+VIS Interface Meeting
13:30-
Participants:
- Schedule for IX: Release is scheduled on 2/18.
- Schedule for IY: Disconnection is scheduled on 3/11.
- Schedule for EX: Connection is scheduled in the week of 3/15.
- Corrugate tube fixing jig: Re-measurement is planed in 2/26-3/1 at IYV.
- Commissioning in air:
- Commissioning in vacuum:
- Acceptance check: Cryo-payload in IX and Type-A tower in EY are on going.
- PF actuator: Dead line depends on the schedule of commissioning.
- Jig for FC painting: Delivered.
VIS Meeting
14:00-
Participants:
Progress report
General
[Miyo] See Activities/General
Type-A
- Setup of the F2 stage in EY: installation of suspension wire, cabling, calibration of LVDT, check of FR range, tuning
- Connection of the cryo-payload in IX.
- Mounted the geophones onto the IP in IX.
- Compressed the F0 blades in IX.
Type-B
Type-Bp
[Miyo] See PR3
[Miyo] See PRM
Type-C
Controls
Electronics
Towards O4
- Type-B/Bp remedy work is on going.
- Installation of Type-A is on going in EY.
- Schedule.
- Procedure documents.
- Criteria in the acceptance test.
Safety
Discussion
[Ikeda] How to rescue the stucked picomotor named BF-T for PR3. klog#15976
Travel Plans
The week from 2/15
- Takahashi: 2/15-19
- Sato: 2/15-19
- Hirata: 2/15-19
- Yano: 2/15-19
The week from 2/22
- Takahashi: 2/23-26
- Sato: 2/22-26
- Hirata: 2/23-26
- Yano: 2/22-26
Next meeting
- On 2020/2/19(Fri)