Differences between revisions 29 and 32 (spanning 3 versions)
Revision 29 as of 2021-02-09 07:31:27
Size: 4726
Editor: KousekiMiyo
Comment:
Revision 32 as of 2021-02-09 07:37:09
Size: 4675
Editor: KousekiMiyo
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
 * EX payload upgrade ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15878|15878]]), __takafumi.ushiba__
  *
Comment ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15948|15948]]), __takafumi.ushiba__

'''CRY/Cryostat IY''' 
 * IYC cooling restart ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15951|15951]]), __takayuki.tomaru__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15878|15878]] EX payload upgrade , __takafumi.ushiba__
  *
[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15948|15948]] Comment, __takafumi.ushiba__
'''CRY/Cryostat IY'''
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15951|15951]] IYC cooling restart , __takayuki.tomaru__
Line 12: Line 10:
 * Setup of F3 ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15932|15932]]), __ryutaro.takahashi__
  * Comment ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15936|15936]]), __kouseki.miyo__
 * Setup of F2 ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15950|15950]]), __ryutaro.takahashi__
 * (!) Monday Connection between F3 and F2 ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15959|15959]]), __naohisa.satou__

'''VIS/General''' 
 * Support for common model files: Installation on Type-A (ETMX, ETMY, ITMX) and Type-B (SRM, SR2) ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15641|15641]]), __satoru.ikeda__
  * Comment ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15938|15938]]), __kouseki.miyo__
 * We investigated the network connection. ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15737|15737]]), __satoru.ikeda__
  * (!) Monday Comment ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15956|15956]]), __satoru.ikeda__
 * (!) Monday About Picomotor's 24-hour operation ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15958|15958]]), __satoru.ikeda__

'''VIS/PR3''' 
 * Gluing the mirror wire. ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15844|15844]]), __fabian.arellano__
  * Comment ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15941|15941]]), __fabian.arellano__
 * Traverser motor test and cabling. ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15889|15889]]), __fabian.arellano__
  * Comment ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15944|15944]]), __satoru.ikeda__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15932|15932]] Setup of F3 , __ryutaro.takahashi__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15936|15936]] Comment, __kouseki.miyo__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15950|15950]] Setup of F2 , __ryutaro.takahashi__
 * (!) Monday [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15959|15959]] Connection between F3 and F2 , __naohisa.satou__
'''VIS/General'''
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15641|15641]] Support for common model files: Installation on Type-A (ETMX, ETMY, ITMX) and Type-B (SRM, SR2) , __satoru.ikeda__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15938|15938]] Comment, __kouseki.miyo__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15737|15737]] We investigated the network connection. , __satoru.ikeda__
  * (!) Monday [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15956|15956]] Comment, __satoru.ikeda__
 * (!) Monday [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15958|15958]] About Picomotor's 24-hour operation , __satoru.ikeda__
'''VIS/PR3'''
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15844|15844]] Gluing the mirror wire. , __fabian.arellano__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15941|15941]] Comment, __fabian.arellano__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15889|15889]] Traverser motor test and cabling. , __fabian.arellano__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15944|15944]] Comment, __satoru.ikeda__
Line 31: Line 26:
 * PRM glitch investigation: ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=9449|9449]]), __koki.okutomi__
  * (!) Tuesday Comment ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15960|15960]]), __kouseki.miyo__
 * (!) Monday Checking the operation of PRM's Picomotor PRM_BF and PRM_IM ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15957|15957]]), __satoru.ikeda__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=9449|9449]] PRM glitch investigation: , __koki.okutomi__
  *  (!) Tuesday [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15960|15960]] Comment, __kouseki.miyo__
 * (!) Monday [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15957|15957]] Checking the operation of PRM's Picomotor PRM_BF and PRM_IM , __satoru.ikeda__
Line 36: Line 30:
 * Support for common Payload model files: Payload of Type-B (SR2) is supported to PAYLOAD_MASTER. ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15684|15684]]), __satoru.ikeda__
  * Comment ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15937|15937]]), __kouseki.miyo__

'''VIS/SR3''' 
 * Oplev installation and alignment recovery. ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15928|15928]]), __fabian.arellano__
  * Comment ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15935|15935]]), __kouseki.miyo__
  * (!) Monday Comment ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15953|15953]]), __fabian.arellano__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15684|15684]] Support for common Payload model files: Payload of Type-B (SR2) is supported to PAYLOAD_MASTER. , __satoru.ikeda__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15937|15937]] Comment, __kouseki.miyo__
'''VIS/SR3'''
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15928|15928]] Oplev installation and alignment recovery. , __fabian.arellano__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15935|15935]] Comment, __kouseki.miyo__
 * (!) Monday [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15953|15953]] Comment , __fabian.arellano__

Activities in this week

CRY/Cryo-payload EX

  • 15878 EX payload upgrade , takafumi.ushiba

    • 15948 Comment, takafumi.ushiba

CRY/Cryostat IY

  • 15951 IYC cooling restart , takayuki.tomaru

VIS/EY

  • 15932 Setup of F3 , ryutaro.takahashi

    • 15936 Comment, kouseki.miyo

  • 15950 Setup of F2 , ryutaro.takahashi

  • (!) Monday 15959 Connection between F3 and F2 , naohisa.satou

VIS/General

  • 15641 Support for common model files: Installation on Type-A (ETMX, ETMY, ITMX) and Type-B (SRM, SR2) , satoru.ikeda

    • 15938 Comment, kouseki.miyo

  • 15737 We investigated the network connection. , satoru.ikeda

    • (!) Monday 15956 Comment, satoru.ikeda

  • (!) Monday 15958 About Picomotor's 24-hour operation , satoru.ikeda

VIS/PR3

  • 15844 Gluing the mirror wire. , fabian.arellano

    • 15941 Comment, fabian.arellano

  • 15889 Traverser motor test and cabling. , fabian.arellano

    • 15944 Comment, satoru.ikeda

VIS/PRM

  • 9449 PRM glitch investigation: , koki.okutomi

    • (!) Tuesday 15960 Comment, kouseki.miyo

  • (!) Monday 15957 Checking the operation of PRM's Picomotor PRM_BF and PRM_IM , satoru.ikeda

VIS/SR2

  • 15684 Support for common Payload model files: Payload of Type-B (SR2) is supported to PAYLOAD_MASTER. , satoru.ikeda

    • 15937 Comment, kouseki.miyo

VIS/SR3

  • 15928 Oplev installation and alignment recovery. , fabian.arellano

    • 15935 Comment, kouseki.miyo

  • (!) Monday 15953 Comment , fabian.arellano

Agenda/Minutes on 2021/2/12

Zoom Meeting

CRY+VIS Interface Meeting

13:30-14:00

Participants:

Post O3 Upgrade portal

VIS Meeting

14:00-14:40

Participants:

Progress report

General

Type-A

Type-B

Type-Bp

Type-C

Controls

Electronics

Towards O4

Safety

Discussion

Travel Plans

The week from 2/8

  • Takahashi: 2/8-12
  • Sato: 2/8-12
  • Hirata: 2/8-12
  • Yano: 2/8-12

The week from 2/15

  • Takahashi: 2/15-19
  • Sato: 2/15-19
  • Hirata: 2/15-19
  • Yano: 2/15-19

Next meeting

  • On 2020/2/12(Fri)

KAGRA/Subgroups/VIS/VISMinutes20210212 (last edited 2021-02-12 21:04:59 by RyutaroTakahashi)