Differences between revisions 33 and 37 (spanning 4 versions)
Revision 33 as of 2021-02-09 07:42:15
Size: 4676
Editor: KousekiMiyo
Comment:
Revision 37 as of 2021-02-10 06:45:57
Size: 4686
Editor: KousekiMiyo
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
'''CRY/Cryo-payload EX'''
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15878|15878]] EX payload upgrade , __takafumi.ushiba__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15948|15948]] Comment, __takafumi.ushiba__
'''CRY/Cryostat IY'''
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15951|15951]] IYC cooling restart , __takayuki.tomaru__
Line 13: Line 8:
 * (!) Monday [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15959|15959]] Connection between F3 and F2 , __naohisa.satou__  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15959|15959]] Connection between F3 and F2 ,  __naohisa.satou__
Line 18: Line 13:
  * (!) Monday [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15956|15956]] Comment, __satoru.ikeda__
 * (!) Monday [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15958|15958]] About Picomotor's 24-hour operation , __satoru.ikeda__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15956|15956]] Comment, __satoru.ikeda__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15958|15958]] About Picomotor's 24-hour operation , __satoru.ikeda__
 * (!) Tuesday [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15965|15965]] Integration of Cryo Payload Phytron motor driver into MEDM , __satoru.ikeda__
'''VIS/IX'''
 * (!) Tuesday [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15968|15968]] Connection to cryo-payload , __ryutaro.takahashi__
Line 28: Line 26:
 * (!) Monday [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15957|15957]] Checking the operation of PRM's Picomotor PRM_BF and PRM_IM , __satoru.ikeda__  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15957|15957]] Checking the operation of PRM's Picomotor PRM_BF and PRM_IM ,  __satoru.ikeda__
Line 35: Line 33:
  * (!) Monday [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15953|15953]] Comment , __fabian.arellano__  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15953|15953]] Comment , __fabian.arellano__
 * (!) Tuesday [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15963|15963]] IM ballast mass adjustment , __fabian.arellano__

Activities in this week

VIS/EY

  • 15932 Setup of F3 , ryutaro.takahashi

    • 15936 Comment, kouseki.miyo

  • 15950 Setup of F2 , ryutaro.takahashi

  • 15959 Connection between F3 and F2 , naohisa.satou

VIS/General

  • 15641 Support for common model files: Installation on Type-A (ETMX, ETMY, ITMX) and Type-B (SRM, SR2) , satoru.ikeda

    • 15938 Comment, kouseki.miyo

  • 15737 We investigated the network connection. , satoru.ikeda

    • 15956 Comment, satoru.ikeda

  • 15958 About Picomotor's 24-hour operation , satoru.ikeda

  • (!) Tuesday 15965 Integration of Cryo Payload Phytron motor driver into MEDM , satoru.ikeda

VIS/IX

  • (!) Tuesday 15968 Connection to cryo-payload , ryutaro.takahashi

VIS/PR3

  • 15844 Gluing the mirror wire. , fabian.arellano

    • 15941 Comment, fabian.arellano

  • 15889 Traverser motor test and cabling. , fabian.arellano

    • 15944 Comment, satoru.ikeda

VIS/PRM

  • 9449 PRM glitch investigation: , koki.okutomi

    • (!) Tuesday 15960 Comment, kouseki.miyo

  • 15957 Checking the operation of PRM's Picomotor PRM_BF and PRM_IM , satoru.ikeda

VIS/SR2

  • 15684 Support for common Payload model files: Payload of Type-B (SR2) is supported to PAYLOAD_MASTER. , satoru.ikeda

    • 15937 Comment, kouseki.miyo

VIS/SR3

  • 15928 Oplev installation and alignment recovery. , fabian.arellano

    • 15935 Comment, kouseki.miyo

  • 15953 Comment , fabian.arellano

  • (!) Tuesday 15963 IM ballast mass adjustment , fabian.arellano

Agenda/Minutes on 2021/2/12

Zoom Meeting

CRY+VIS Interface Meeting

13:30-14:00

Participants:

Post O3 Upgrade portal

VIS Meeting

14:00-14:40

Participants:

Progress report

General

Type-A

Type-B

Type-Bp

Type-C

Controls

Electronics

Towards O4

Safety

Discussion

Travel Plans

The week from 2/8

  • Takahashi: 2/8-12
  • Sato: 2/8-12
  • Hirata: 2/8-12
  • Yano: 2/8-12

The week from 2/15

  • Takahashi: 2/15-19
  • Sato: 2/15-19
  • Hirata: 2/15-19
  • Yano: 2/15-19

Next meeting

  • On 2020/2/12(Fri)

KAGRA/Subgroups/VIS/VISMinutes20210212 (last edited 2021-02-12 21:04:59 by RyutaroTakahashi)