Differences between revisions 38 and 39
Revision 38 as of 2021-02-11 08:13:33
Size: 6656
Editor: KousekiMiyo
Comment:
Revision 39 as of 2021-02-11 08:15:19
Size: 6225
Editor: KousekiMiyo
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
From: 2021-02-05 00:00:00
 *
'''CRY/Cryo-payload EX'''
'''CRY/Cryo-payload EX'''
Line 8: Line 7:
 * '''CRY/Cryo-payload IX''' '''CRY/Cryo-payload IX'''
Line 10: Line 9:
 * '''CRY/Cryo-payload IX'''
Line 12: Line 10:
 * '''CRY/Cryostat IY''' '''CRY/Cryostat IY'''
Line 15: Line 13:
 * '''CRY/Cryostat IY'''
Line 17: Line 14:
 * '''CRY/Cryostat IY'''
Line 19: Line 15:
 * '''VIS/EY''' '''VIS/EY'''
Line 21: Line 17:
 * '''VIS/EY'''
Line 23: Line 18:
 * '''VIS/EY'''
Line 25: Line 19:
 * '''VIS/EY'''
Line 27: Line 20:
 * '''VIS/General''' '''VIS/General'''
Line 30: Line 23:
 * '''VIS/General'''
Line 32: Line 24:
 * '''VIS/General'''
Line 34: Line 25:
 * '''VIS/General'''
Line 36: Line 26:
 * '''VIS/IX''' '''VIS/IX'''
Line 39: Line 29:
 * '''VIS/IX'''
Line 41: Line 30:
 * '''VIS/IX'''
Line 43: Line 31:
 * '''VIS/MCE''' '''VIS/MCE'''
Line 45: Line 33:
 * '''VIS/PR3''' '''VIS/PR3'''
Line 48: Line 36:
 * '''VIS/PR3'''
Line 51: Line 38:
 * '''VIS/PR3''' '''VIS/PR3'''
Line 53: Line 40:
 * '''VIS/PR3'''
Line 55: Line 41:
 * '''VIS/PRM''' '''VIS/PRM'''
Line 58: Line 44:
  * '''VIS/PRM'''
Line 60: Line 45:
 * '''VIS/PRM'''
Line 62: Line 46:
 * '''VIS/SR3''' '''VIS/SR3'''
Line 65: Line 49:
 * '''VIS/SR3'''
Line 68: Line 51:
 * '''VIS/SR3'''

Activities in this week

CRY/Cryo-payload EX

  • 15878 EX payload upgrade , takafumi.ushiba

    • 15948 Comment, takafumi.ushiba

CRY/Cryo-payload IX

  • 15967 Installation of ITMX to the cryostat , takafumi.ushiba

  • (!) Wednesday 15980 Cabling check of ITMX after installation , takafumi.ushiba

CRY/Cryostat IY

  • 15768 Start cooling of the payload at IYC , nobuhiro.kimura

    • 15964 Comment, nobuhiro.kimura

  • 15951 IYC cooling restart , takayuki.tomaru

  • 15966 IYC Experiment , rishabh.bajpai

VIS/EY

  • 15950 Setup of F2 , ryutaro.takahashi

  • 15959 Connection between F3 and F2 , naohisa.satou

  • (!) Wednesday 15972 Cabling between F3 and F2 , naohisa.satou

  • (!) Wednesday 15982 Setup of F2 , ryutaro.takahashi

VIS/General

  • 15737 We investigated the network connection. , satoru.ikeda

    • 15956 Comment, satoru.ikeda

  • 15958 About Picomotor's 24-hour operation , satoru.ikeda

  • 15965 Integration of Cryo Payload Phytron motor driver into MEDM , satoru.ikeda

  • (!) Wednesday 15983 I posted this by mistake. , satoru.ikeda

VIS/IX

  • 15968 Connection to cryo-payload , ryutaro.takahashi

    • (!) Wednesday 15974 Comment, ryutaro.takahashi

  • 15968 Connection to cryo-payload , ryutaro.takahashi

  • (!) Wednesday 15981 Setup of pre-isolator , ryutaro.takahashi

VIS/MCE

  • (!) Wednesday 15987 MCe oplev , tomotada.akutsu

VIS/PR3

  • 15889 Traverser motor test and cabling. , fabian.arellano

    • 15944 Comment, satoru.ikeda

  • (!) Wednesday 15976 Picomotor of PR3_BF_T(Motor2) got stuck , satoru.ikeda

    • (!) Wednesday 15979 Comment, satoru.ikeda

VIS/PR3

  • (!) Wednesday 15976 Picomotor of PR3_BF_T(Motor2) got stuck , satoru.ikeda

  • (!) Wednesday 15977 PR3 IM PITCH, ROLL, YAW's Picomotor is operated to measure the travel and drive range , satoru.ikeda

VIS/PRM

  • 9449 PRM glitch investigation: , koki.okutomi

    • 15960 Comment, kouseki.miyo

  • (!) Thursday 15988 Comment , kouseki.miyo

  • 15957 Checking the operation of PRM's Picomotor PRM_BF and PRM_IM , satoru.ikeda

VIS/SR3

  • 15928 Oplev installation and alignment recovery. , fabian.arellano

    • 15953 Comment, fabian.arellano

  • 15963 IM ballast mass adjustment , fabian.arellano

    • (!) Wednesday 15975 Comment, fabian.arellano

  • 15963 IM ballast mass adjustment , fabian.arellano

Agenda/Minutes on 2021/2/12

Zoom Meeting

CRY+VIS Interface Meeting

13:30-14:00

Participants:

Post O3 Upgrade portal

VIS Meeting

14:00-14:40

Participants:

Progress report

General

Type-A

Type-B

Type-Bp

Type-C

Controls

Electronics

Towards O4

Safety

Discussion

Travel Plans

The week from 2/8

  • Takahashi: 2/8-12
  • Sato: 2/8-12
  • Hirata: 2/8-12
  • Yano: 2/8-12

The week from 2/15

  • Takahashi: 2/15-19
  • Sato: 2/15-19
  • Hirata: 2/15-19
  • Yano: 2/15-19

Next meeting

  • On 2020/2/12(Fri)

KAGRA/Subgroups/VIS/VISMinutes20210212 (last edited 2021-02-12 21:04:59 by RyutaroTakahashi)