Size: 6656
Comment:
|
Size: 5302
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 4: | Line 4: |
From: 2021-02-05 00:00:00 * '''CRY/Cryo-payload EX''' * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15878|15878]] EX payload upgrade , __takafumi.ushiba__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15948|15948]] Comment, __takafumi.ushiba__ * '''CRY/Cryo-payload IX''' * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15967|15967]] Installation of ITMX to the cryostat , __takafumi.ushiba__ * '''CRY/Cryo-payload IX''' * (!) Wednesday [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15980|15980]] Cabling check of ITMX after installation , __takafumi.ushiba__ * '''CRY/Cryostat IY''' * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15768|15768]] Start cooling of the payload at IYC , __nobuhiro.kimura__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15964|15964]] Comment, __nobuhiro.kimura__ * '''CRY/Cryostat IY''' * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15951|15951]] IYC cooling restart , __takayuki.tomaru__ * '''CRY/Cryostat IY''' * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15966|15966]] IYC Experiment , __rishabh.bajpai__ * '''VIS/EY''' |
'''VIS/EY''' |
Line 21: | Line 6: |
* '''VIS/EY''' | |
Line 23: | Line 7: |
* '''VIS/EY''' | |
Line 25: | Line 8: |
* '''VIS/EY''' | |
Line 27: | Line 9: |
* '''VIS/General''' | '''VIS/General''' |
Line 30: | Line 12: |
* '''VIS/General''' | |
Line 32: | Line 13: |
* '''VIS/General''' | |
Line 34: | Line 14: |
* '''VIS/General''' | |
Line 36: | Line 15: |
* '''VIS/IX''' | '''VIS/IX''' |
Line 39: | Line 18: |
* '''VIS/IX''' | |
Line 41: | Line 19: |
* '''VIS/IX''' | |
Line 43: | Line 20: |
* '''VIS/MCE''' | '''VIS/MCE''' |
Line 45: | Line 22: |
* '''VIS/PR3''' | '''VIS/PR3''' |
Line 48: | Line 25: |
* '''VIS/PR3''' | |
Line 51: | Line 27: |
* '''VIS/PR3''' | '''VIS/PR3''' |
Line 53: | Line 29: |
* '''VIS/PR3''' | |
Line 55: | Line 30: |
* '''VIS/PRM''' | '''VIS/PRM''' |
Line 58: | Line 33: |
* '''VIS/PRM''' | |
Line 60: | Line 34: |
* '''VIS/PRM''' | |
Line 62: | Line 35: |
* '''VIS/SR3''' | '''VIS/SR3''' |
Line 65: | Line 38: |
* '''VIS/SR3''' | |
Line 68: | Line 40: |
* '''VIS/SR3''' |
Contents
Activities in this week
VIS/EY
15950 Setup of F2 , ryutaro.takahashi
15959 Connection between F3 and F2 , naohisa.satou
Wednesday 15972 Cabling between F3 and F2 , naohisa.satou
Wednesday 15982 Setup of F2 , ryutaro.takahashi
VIS/General
15737 We investigated the network connection. , satoru.ikeda
15956 Comment, satoru.ikeda
15958 About Picomotor's 24-hour operation , satoru.ikeda
15965 Integration of Cryo Payload Phytron motor driver into MEDM , satoru.ikeda
Wednesday 15983 I posted this by mistake. , satoru.ikeda
VIS/IX
15968 Connection to cryo-payload , ryutaro.takahashi
Wednesday 15974 Comment, ryutaro.takahashi
15968 Connection to cryo-payload , ryutaro.takahashi
Wednesday 15981 Setup of pre-isolator , ryutaro.takahashi
VIS/MCE
Wednesday 15987 MCe oplev , tomotada.akutsu
VIS/PR3
15889 Traverser motor test and cabling. , fabian.arellano
15944 Comment, satoru.ikeda
Wednesday 15976 Picomotor of PR3_BF_T(Motor2) got stuck , satoru.ikeda
Wednesday 15979 Comment, satoru.ikeda
VIS/PR3
Wednesday 15976 Picomotor of PR3_BF_T(Motor2) got stuck , satoru.ikeda
Wednesday 15977 PR3 IM PITCH, ROLL, YAW's Picomotor is operated to measure the travel and drive range , satoru.ikeda
VIS/PRM
9449 PRM glitch investigation: , koki.okutomi
15960 Comment, kouseki.miyo
Thursday 15988 Comment , kouseki.miyo
15957 Checking the operation of PRM's Picomotor PRM_BF and PRM_IM , satoru.ikeda
VIS/SR3
15928 Oplev installation and alignment recovery. , fabian.arellano
15953 Comment, fabian.arellano
15963 IM ballast mass adjustment , fabian.arellano
Wednesday 15975 Comment, fabian.arellano
15963 IM ballast mass adjustment , fabian.arellano
Agenda/Minutes on 2021/2/12
CRY+VIS Interface Meeting
13:30-14:00
Participants:
VIS Meeting
14:00-14:40
Participants:
Progress report
General
Type-A
Type-B
Type-Bp
Type-C
Controls
Electronics
Towards O4
- Type-B/Bp remedy work is on going.
- Installation of Type-A is on going in EY.
- Schedule.
- Procedure documents.
- Criteria in the acceptance test.
Safety
Discussion
Travel Plans
The week from 2/8
- Takahashi: 2/8-12
- Sato: 2/8-12
- Hirata: 2/8-12
- Yano: 2/8-12
The week from 2/15
- Takahashi: 2/15-19
- Sato: 2/15-19
- Hirata: 2/15-19
- Yano: 2/15-19
Next meeting
- On 2020/2/12(Fri)