Differences between revisions 6 and 21 (spanning 15 versions)
Revision 6 as of 2021-02-08 07:49:25
Size: 7111
Editor: KousekiMiyo
Comment:
Revision 21 as of 2021-02-08 08:33:33
Size: 3908
Editor: KousekiMiyo
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
 * VIS/OMM, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15617|15617]], ryutaro.takahashi: Modification of ACCs
  * VIS/OMM, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15872|15872]], ryutaro.takahashi: Comment
 * VIS/SR2, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15684|15684]], satoru.ikeda: Support for common Payload model files: Payload of Type-B (SR2) is supported to PAYLOAD_MASTER.
  * VIS/SR2, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15937|15937]], kouseki.miyo: Comment
 * VIS/General, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15737|15737]], satoru.ikeda: We investigated the network connection.
  * VIS/General, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15877|15877]], satoru.ikeda: Comment
 * VIS/PR3, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15844|15844]], fabian.arellano: Gluing the mirror wire.
  * VIS/PR3, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15875|15875]], fabian.arellano: Comment
  * VIS/PR3, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15885|15885]], fabian.arellano: Comment
  * VIS/PR3, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15941|15941]], fabian.arellano: Comment
 * VIS/General, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15847|15847]], satoru.ikeda: Relay Switch of Stepper Motor Driver
  * VIS/General, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15873|15873]], kouseki.miyo: Comment
 * VIS/PR2, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15857|15857]], satoru.ikeda: The PR2-SF's stepper motor has stalled.
  * VIS/PR2, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15876|15876]], satoru.ikeda: Comment
  * VIS/PR2, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15880|15880]], satoru.ikeda: Comment
  * VIS/PR2, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15882|15882]], satoru.ikeda: Comment
 * VIS/General, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15868|15868]], kouseki.miyo: Some suspensions are not SAFE.
  * VIS/General, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15923|15923]], kouseki.miyo: Comment
 * VIS/PR3, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15889|15889]], fabian.arellano: Traverser motor test and cabling.
  * VIS/PR3, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15920|15920]], satoru.ikeda: Comment
  * VIS/PR3, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15944|15944]], satoru.ikeda: Comment
  * VIS/PR3, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15890|15890]], satoru.ikeda: Comment
  * VIS/PR3, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15911|15911]], satoru.ikeda: Comment
 * VIS/EY, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15891|15891]], ryutaro.takahashi: Setup of F3
  * VIS/EY, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15912|15912]], kouseki.miyo: Comment
  * VIS/EY, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15918|15918]], ryutaro.takahashi: Comment
  * VIS/EY, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15894|15894]], kouseki.miyo: Comment
  * VIS/EY, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15893|15893]], kouseki.miyo: Comment
  * VIS/EY, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15906|15906]], kouseki.miyo: Comment
 * VIS/EY, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15919|15919]], ryutaro.takahashi: Setup of BF
  * VIS/EY, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15926|15926]], kouseki.miyo: Comment
  * VIS/EY, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15931|15931]], ryutaro.takahashi: Comment
 * VIS/SR3, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15928|15928]], fabian.arellano: Oplev installation and alignment recovery.
  * VIS/SR3, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15935|15935]], kouseki.miyo: Comment
 * VIS/EY, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15932|15932]], ryutaro.takahashi: Setup of F3
  * VIS/EY, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15936|15936]], kouseki.miyo: Comment
 * VIS/PR3, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15886|15886]], satoru.ikeda: Driveable range of the PR3 GAS SF stepper motor
 * VIS/General, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15888|15888]], kouseki.miyo: All payload models are in PAYLOAD_MASTER.mdl
 * VIS/PR3, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15889|15889]], fabian.arellano: Traverser motor test and cabling.
 * VIS/EY, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15891|15891]], ryutaro.takahashi: Setup of F3
 * VIS/EY, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15910|15910]], kouseki.miyo: TF measurement for F3 GAS filter
 * VIS/EY, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15919|15919]], ryutaro.takahashi: Setup of BF
 * VIS/SR3, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15921|15921]], fabian.arellano: Oplev installation.
 * VIS/SR3, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15928|15928]], fabian.arellano: Oplev installation and alignment recovery.
 * VIS/PR2, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15930|15930]], satoru.ikeda: Connect and check the drive of the PR2 traverser.
 * VIS/EY, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15932|15932]], ryutaro.takahashi: Setup of F3
 * VIS/General, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15938|15938]], kouseki.miyo: Comment to Support for common model files: Installation on Type-A (ETMX, ETMY, ITMX) and Type-B (SRM, SR2) (Click here to view original report: 15641)
 * VIS/EY, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15950|15950]], ryutaro.takahashi: Setup of F2
 * '''CRY/Cryo-payload EX''', __takafumi.ushiba__: EX payload upgrade ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15878|15878]])
  * (!) Friday __takafumi.ushiba__: Comment ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15948|15948]])
 * '''CRY/Cryostat IY''', (!) Saturday __takayuki.tomaru__: IYC cooling restart ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15951|15951]])
 * '''VIS/EY''', __ryutaro.takahashi__: Setup of F3 ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15932|15932]])
  * (!) Friday __kouseki.miyo__: Comment ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15936|15936]])
 * '''VIS/EY''', (!) Saturday __ryutaro.takahashi__: Setup of F2 ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15950|15950]])
 * '''VIS/General''', __satoru.ikeda__: Support for common model files: Installation on Type-A (ETMX, ETMY, ITMX) and Type-B (SRM, SR2) ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15641|15641]])
  * (!) Friday __kouseki.miyo__: Comment ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15938|15938]])
 * '''VIS/PR3''', __fabian.arellano__: Gluing the mirror wire. ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15844|15844]])
  * (!) Friday __fabian.arellano__: Comment ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15941|15941]])
 * '''VIS/PR3''', __fabian.arellano__: Traverser motor test and cabling. ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15889|15889]])
  * (!) Friday __satoru.ikeda__: Comment ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15944|15944]])
 * '''VIS/SR2''', __satoru.ikeda__: Support for common Payload model files: Payload of Type-B (SR2) is supported to PAYLOAD_MASTER. ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15684|15684]])
  * (!) Friday __kouseki.miyo__: Comment ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15937|15937]])
 * '''VIS/SR3''', __fabian.arellano__: Oplev installation and alignment recovery. ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15928|15928]])
  * (!) Friday __kouseki.miyo__: Comment ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15935|15935]])
Line 53: Line 21:
= Agenda/Minutes on 2021/2/5 = = Agenda/Minutes on 2021/2/12 =

Activities in this week

  • CRY/Cryo-payload EX, takafumi.ushiba: EX payload upgrade (15878)

    • (!) Friday takafumi.ushiba: Comment (15948)

  • CRY/Cryostat IY, (!) Saturday takayuki.tomaru: IYC cooling restart (15951)

  • VIS/EY, ryutaro.takahashi: Setup of F3 (15932)

    • (!) Friday kouseki.miyo: Comment (15936)

  • VIS/EY, (!) Saturday ryutaro.takahashi: Setup of F2 (15950)

  • VIS/General, satoru.ikeda: Support for common model files: Installation on Type-A (ETMX, ETMY, ITMX) and Type-B (SRM, SR2) (15641)

    • (!) Friday kouseki.miyo: Comment (15938)

  • VIS/PR3, fabian.arellano: Gluing the mirror wire. (15844)

    • (!) Friday fabian.arellano: Comment (15941)

  • VIS/PR3, fabian.arellano: Traverser motor test and cabling. (15889)

    • (!) Friday satoru.ikeda: Comment (15944)

  • VIS/SR2, satoru.ikeda: Support for common Payload model files: Payload of Type-B (SR2) is supported to PAYLOAD_MASTER. (15684)

    • (!) Friday kouseki.miyo: Comment (15937)

  • VIS/SR3, fabian.arellano: Oplev installation and alignment recovery. (15928)

    • (!) Friday kouseki.miyo: Comment (15935)

Agenda/Minutes on 2021/2/12

Zoom Meeting

CRY+VIS Interface Meeting

13:30-14:00

Participants:

Post O3 Upgrade portal

VIS Meeting

14:00-14:40

Participants:

Progress report

General

Type-A

Type-B

Type-Bp

Type-C

Controls

Electronics

Towards O4

Safety

Discussion

Travel Plans

The week from 2/8

  • Takahashi: 2/8-12
  • Sato: 2/8-12
  • Hirata: 2/8-12
  • Yano: 2/8-12

The week from 2/15

  • Takahashi: 2/15-19
  • Sato: 2/15-19
  • Hirata: 2/15-19
  • Yano: 2/15-19

Next meeting

  • On 2020/2/12(Fri)

KAGRA/Subgroups/VIS/VISMinutes20210212 (last edited 2021-02-12 21:04:59 by RyutaroTakahashi)