'''Summary''': Ikeda-san worked following items; (1) Measured the length of the network cable (15956) and now prepare to order the cables with DGS group. (2) He got message from manufacturer that it is difficult to operate the picomotor for long time (more 24 hours). So he is now considering to request to AEL group to make the circuit box that turns power on and off with BIO signal like the stepper motor circuit. (15958) (3) He made the new MEDM screen for stepper motor on MN stage which is developed by Nishimoto-kun. We can open the screen from [sitemap]/[STEPPING MOTOR]/[CRY_OVERVIEW] (15965). |
|
Line 27: | Line 35: |
'''Summary''': Akutsu-san found the OpLev light hit on the edge of the MCE mirror during his investigation on IMC ghost beams. |
|
Line 29: | Line 39: |
== VIS/PR3 == * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15976|15976]] Picomotor of PR3_BF_T(Motor2) got stuck , __satoru.ikeda__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15979|15979]] Comment, __satoru.ikeda__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15976|15976]] Picomotor of PR3_BF_T(Motor2) got stuck , __satoru.ikeda__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15977|15977]] PR3 IM PITCH, ROLL, YAW's Picomotor is operated to measure the travel and drive range , __satoru.ikeda__ |
|
Line 35: | Line 40: |
'''Summary''': (1) Miyo fixed the swapped cabling on the BF-damper for PRM with Nakagaki-san, and after that, the noise coupling of the transfer function at higher frequency is decreased to the same behavior of other PR suspensions (15994). (2) Ikeda-san touched the picomotor of PRM for his first operation (15957) before measure the calibration factor between picomotor and OSEM. |
|
Line 40: | Line 51: |
== VIS/PR3 == '''Summary''': Ikeda-san tested the picomotor operation and measured rough calibration value for PR3-IM picomotor (15977). During the test for BF picomotor, it was stucked (15976). So we need open the top chamber to fix that. * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15977|15977]] PR3 IM PITCH, ROLL, YAW's Picomotor is operated to measure the travel and drive range , __satoru.ikeda__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15976|15976]] Picomotor of PR3_BF_T(Motor2) got stuck , __satoru.ikeda__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15979|15979]] Comment, __satoru.ikeda__ |
|
Line 76: | Line 94: |
[Miyo] See [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/VISMinutes20210212#VIS.2BAC8-General|Activities/General]] |
|
Line 77: | Line 97: |
[Takahashi] See [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/VISMinutes20210212#VIS.2BAC8-EY|EY]] | |
Line 78: | Line 99: |
[Takahashi] See [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/VISMinutes20210212#VIS.2BAC8-IX|IX]] |
|
Line 84: | Line 107: |
[Miyo] See [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/VISMinutes20210212#VIS.2BAC8-PR3|PR3]] [Miyo] See [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/VISMinutes20210212#VIS.2BAC8-PRM|PRM]] |
|
Line 85: | Line 113: |
[Miyo] See [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/VISMinutes20210212#VIS.2BAC8-MCE|MCE]] |
Contents
Activities in this week
VIS/General
Summary: Ikeda-san worked following items;
(1) Measured the length of the network cable (15956) and now prepare to order the cables with DGS group.
(2) He got message from manufacturer that it is difficult to operate the picomotor for long time (more 24 hours). So he is now considering to request to AEL group to make the circuit box that turns power on and off with BIO signal like the stepper motor circuit. (15958)
(3) He made the new MEDM screen for stepper motor on MN stage which is developed by Nishimoto-kun. We can open the screen from [sitemap]/[STEPPING MOTOR]/[CRY_OVERVIEW] (15965).
15737 We investigated the network connection. , satoru.ikeda
15956 Comment, satoru.ikeda
15958 About Picomotor's 24-hour operation , satoru.ikeda
15965 Integration of Cryo Payload Phytron motor driver into MEDM , satoru.ikeda
15983 I posted this by mistake. , satoru.ikeda
VIS/EY
Summary: Setup of the F2 stage in EY: installation of suspension wire, cabling, calibration of LVDT, check of FR range, tuning
15950 Setup of F2 , ryutaro.takahashi
15959 Connection between F3 and F2 , naohisa.satou
15972 Cabling between F3 and F2 , naohisa.satou
15982 Setup of F2 , ryutaro.takahashi
Thursday 15993 Setup of F2 , ryutaro.takahashi
VIS/IX
Summary: Connection of the cryo-payload in IX, mounted the geophones onto the IP in IX, and compressed the F0 blades in IX.
15968 Connection to cryo-payload , ryutaro.takahashi
15974 Comment, ryutaro.takahashi
15968 Connection to cryo-payload , ryutaro.takahashi
15981 Setup of pre-isolator , ryutaro.takahashi
VIS/MCE
Summary: Akutsu-san found the OpLev light hit on the edge of the MCE mirror during his investigation on IMC ghost beams.
15987 MCe oplev , tomotada.akutsu
VIS/PRM
Summary:
(1) Miyo fixed the swapped cabling on the BF-damper for PRM with Nakagaki-san, and after that, the noise coupling of the transfer function at higher frequency is decreased to the same behavior of other PR suspensions (15994).
(2) Ikeda-san touched the picomotor of PRM for his first operation (15957) before measure the calibration factor between picomotor and OSEM.
9449 PRM glitch investigation: , koki.okutomi
15957 Checking the operation of PRM's Picomotor PRM_BF and PRM_IM , satoru.ikeda
VIS/PR3
Summary: Ikeda-san tested the picomotor operation and measured rough calibration value for PR3-IM picomotor (15977). During the test for BF picomotor, it was stucked (15976). So we need open the top chamber to fix that.
15977 PR3 IM PITCH, ROLL, YAW's Picomotor is operated to measure the travel and drive range , satoru.ikeda
15976 Picomotor of PR3_BF_T(Motor2) got stuck , satoru.ikeda
15979 Comment, satoru.ikeda
VIS/SR3
15928 Oplev installation and alignment recovery. , fabian.arellano
15953 Comment, fabian.arellano
15963 IM ballast mass adjustment , fabian.arellano
Agenda/Minutes on 2021/2/12
CRY+VIS Interface Meeting
13:30-
Participants:
- Schedule for IX: Release is scheduled on 2/18.
- Schedule for IY: Disconnection is scheduled on 3/11.
- Schedule for EX: Connection is scheduled in the week of 3/15.
- Corrugate tube fixing jig: Re-measurement is planed in 2/26-3/1 at IYV.
- Commissioning in air:
- Commissioning in vacuum:
- Acceptance check: Cryo-payload in IX and Type-A tower in EY are on going.
- PF actuator: Dead line depends on the schedule of commissioning.
- Jig for FC painting: Delivered.
VIS Meeting
14:00-
Participants:
Progress report
General
[Miyo] See Activities/General
Type-A
[Takahashi] See EY
- Setup of the F2 stage in EY: installation of suspension wire, cabling, calibration of LVDT, check of FR range, tuning
[Takahashi] See IX
- Connection of the cryo-payload in IX.
- Mounted the geophones onto the IP in IX.
- Compressed the F0 blades in IX.
Type-B
Type-Bp
[Miyo] See PR3
[Miyo] See PRM
Type-C
[Miyo] See MCE
Controls
Electronics
Towards O4
- Type-B/Bp remedy work is on going.
- Installation of Type-A is on going in EY.
- Schedule.
- Procedure documents.
- Criteria in the acceptance test.
Safety
Discussion
[Ikeda] How to rescue the stucked picomotor named BF-T for PR3. klog#15976
Travel Plans
The week from 2/15
- Takahashi: 2/15-19
- Sato: 2/15-19
- Hirata: 2/15-19
- Yano: 2/15-19
The week from 2/22
- Takahashi: 2/23-26
- Sato: 2/22-26
- Hirata: 2/23-26
- Yano: 2/22-26
Next meeting
- On 2020/2/19(Fri)