Size: 5204
Comment:
|
Size: 4977
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 28: | Line 28: |
'''VIS/EY''' | From: 2021-02-12 00:00:00 '''EY''' |
Line 31: | Line 32: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16023|16023]] Comment , __ryutaro.takahashi__ * (!) Tuesday [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16034|16034]] Comment , __ryutaro.takahashi__ '''VIS/General''' |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16023|16023]] Comment , __ryutaro.takahashi__ * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16034|16034]] Comment , __ryutaro.takahashi__ '''General''' |
Line 35: | Line 36: |
* (!) Tuesday [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16028|16028]] Comment, __satoru.ikeda__ * (!) Tuesday [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16038|16038]] Initialize the OSEMINF filters for all Type-Bp suspensions , __kouseki.miyo__ * (!) Tuesday [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16040|16040]] Comment, __kouseki.miyo__ * (!) Tuesday [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16036|16036]] Cabling for temperature control equipment , __satoru.ikeda__ * (!) Tuesday [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16038|16038]] Initialize the OSEMINF filters for all Type-Bp suspensions , __kouseki.miyo__ '''VIS/MCF''' * (!) Tuesday [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16041|16041]] Recovery of IMC suspension , __ryutaro.takahashi__ '''VIS/PR3''' |
* (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16028|16028]] Comment, __satoru.ikeda__ * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16038|16038]] Initialize the OSEMINF filters for all Type-Bp suspensions , __kouseki.miyo__ * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16040|16040]] Comment, __kouseki.miyo__ * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16036|16036]] Cabling for temperature control equipment , __satoru.ikeda__ '''MCF''' * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16041|16041]] Recovery of IMC suspension , __ryutaro.takahashi__ '''PR3''' |
Line 45: | Line 45: |
* (!) Tuesday [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16027|16027]] Comment , __satoru.ikeda__ | * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16027|16027]] Comment , __satoru.ikeda__ |
Line 49: | Line 49: |
* (!) Tuesday [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16026|16026]] Comment , __satoru.ikeda__ * (!) Tuesday [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16032|16032]] Comment , __fabian.arellano__ '''VIS/PRM''' |
* (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16026|16026]] Comment , __satoru.ikeda__ * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16032|16032]] Comment , __fabian.arellano__ '''PRM''' |
Line 54: | Line 54: |
'''VIS/SR3''' | '''SR3''' |
Line 59: | Line 59: |
* (!) Tuesday [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16035|16035]] Comment , __fabian.arellano__ | * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16035|16035]] Comment , __fabian.arellano__ |
Contents
Agenda/Minutes on 2021/2/12
CRY+VIS Interface Meeting
13:30-13:55
Participants: Post O3 Upgrade portal
- Schedule for IX: Release is scheduled on 2/18.
- Schedule for IY: Disconnection is scheduled on 3/11.
- Schedule for EX: Connection is scheduled in the week of 3/15.
- Corrugate tube fixing jig: Re-measurement is planed in 2/26-3/1 at IYV.
- Commissioning in air: Commissioning of IX will be started. Other schedule has not been decided yet.
- Commissioning in vacuum: Closing of DN800 flange is available within a half of day.
- Acceptance check: Cryo-payload in IX and Type-A tower in EY are on going.
- PF actuator: Not evaluated in IX, but after the commissioning for suspension.
- Jig for FC painting: Delivered.
VIS Meeting
14:00-15:30
Participants:
Progress report
From: 2021-02-12 00:00:00 EY
15993 Setup of F2 , ryutaro.takahashi
General
15737 We investigated the network connection. , satoru.ikeda
16028 Comment, satoru.ikeda
16038 Initialize the OSEMINF filters for all Type-Bp suspensions , kouseki.miyo
16040 Comment, kouseki.miyo
16036 Cabling for temperature control equipment , satoru.ikeda
MCF
16041 Recovery of IMC suspension , ryutaro.takahashi
PR3
15889 Traverser motor test and cabling. , fabian.arellano
15976 Picomotor of PR3_BF_T(Motor2) got stuck , satoru.ikeda
PRM
SR3
15963 IM ballast mass adjustment , fabian.arellano
16009 Comment, fabian.arellano
16007 Ballast mass adjustment on top of BF , fabian.arellano
16007 Ballast mass adjustment on top of BF , fabian.arellano
Electronics
Control
Towards O4
- Type-B/Bp remedy work is on going.
- Installation of Type-A is on going in EY.
- Schedule.
- Procedure documents.
- Criteria in the acceptance test.
Safety
Discussion
Travel Plans
Next meeting
- On 2020/2/zz(Fri)