Differences between revisions 11 and 15 (spanning 4 versions)
Revision 11 as of 2021-02-17 07:01:47
Size: 5346
Editor: KousekiMiyo
Comment:
Revision 15 as of 2021-02-18 20:28:30
Size: 5083
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
= Agenda/Minutes on 2021/2/12 = = Agenda/Minutes on 2021/2/19 =
Line 7: Line 7:
13:30-13:55 13:30-
Line 9: Line 9:
Participants:  Participants:
Line 12: Line 13:
 * Schedule for IX: Release is scheduled on 2/18.  * Schedule for IX: Released on 2/18. BF is overload.
Line 17: Line 18:
 * Commissioning in vacuum: Closing of DN800 flange is available within a half of day.  * Commissioning in vacuum:
Line 20: Line 21:
 * Jig for FC painting: Delivered.  * Jig for FC painting: Assembling.
Line 23: Line 24:
14:00-15:30 14:00-
Line 28: Line 29:
From: 2021-02-12 00:00:00
 * '''EY'''
'''EY'''
Line 32: Line 32:
  * '''EY'''
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16023|16023]] Comment , __ryutaro.takahashi__
  *  '''EY'''
 *
(!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16034|16034]] Comment , __ryutaro.takahashi__
 * '''General'''
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16023|16023]] Comment , __ryutaro.takahashi__
  * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16034|16034]] Comment , __ryutaro.takahashi__
'''General'''
Line 39: Line 37:
 * '''General'''
Line 42: Line 39:
 * '''General'''
Line 44: Line 40:
 * '''General'''
 * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16038|16038]] Initialize the OSEMINF filters for all Type-Bp suspensions , __kouseki.miyo__
 * '''MCF'''
'''MCF'''
Line 48: Line 42:
 * '''PR3''' '''PR3'''
Line 51: Line 45:
  * '''PR3'''
* (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16027|16027]] Comment , __satoru.ikeda__
 * '''PR3'''
  * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16027|16027]] Comment , __satoru.ikeda__
Line 56: Line 48:
  * '''PR3'''
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16024|16024]] Comment , __fabian.arellano__
  * '''PR3'''
* (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16026|16026]] Comment , __satoru.ikeda__
  *  '''PR3'''
 *
(!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16032|16032]] Comment , __fabian.arellano__
 * '''PRM'''
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16024|16024]] Comment , __fabian.arellano__
  * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16026|16026]] Comment , __satoru.ikeda__
  * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16032|16032]] Comment , __fabian.arellano__
'''PRM'''
Line 65: Line 54:
 * '''SR3''' '''SR3'''
Line 68: Line 57:
 * '''SR3'''
Line 71: Line 59:
  * '''SR3'''
* (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16035|16035]] Comment , __fabian.arellano__
 * '''SR3'''
  * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16035|16035]] Comment , __fabian.arellano__
Line 99: Line 85:
The week from 2/22

 * Takahashi: 2/23-2/28
 * Sato: 2/23-26
 * Hirata: 2/23-26
 * Yano: 2/23-26

The week from 3/1

 * Takahashi: 3/1-5
 * Sato: 3/1-5
 * Hirata: 3/1-5
 * Yano: 3/1-5
Line 101: Line 100:
 * On 2020/2/zz(Fri)  * On 2020/2/26(Fri)

Agenda/Minutes on 2021/2/19

Zoom Meeting

CRY+VIS Interface Meeting

13:30-

Participants:

Post O3 Upgrade portal

  • Schedule for IX: Released on 2/18. BF is overload.
  • Schedule for IY: Disconnection is scheduled on 3/11.
  • Schedule for EX: Connection is scheduled in the week of 3/15.
  • Corrugate tube fixing jig: Re-measurement is planed in 2/26-3/1 at IYV.
  • Commissioning in air: Commissioning of IX will be started. Other schedule has not been decided yet.
  • Commissioning in vacuum:
  • Acceptance check: Cryo-payload in IX and Type-A tower in EY are on going.
  • PF actuator: Not evaluated in IX, but after the commissioning for suspension.
  • Jig for FC painting: Assembling.

VIS Meeting

14:00-

Participants:

Progress report

EY

  • 15993 Setup of F2 , ryutaro.takahashi

    • 15997 Comment, ryutaro.takahashi

    • 16023 Comment , ryutaro.takahashi

    • (!) 16034 Comment , ryutaro.takahashi

General

  • 15737 We investigated the network connection. , satoru.ikeda

    • (!) 16028 Comment, satoru.ikeda

  • (!) 16038 Initialize the OSEMINF filters for all Type-Bp suspensions , kouseki.miyo

    • (!) 16040 Comment, kouseki.miyo

  • (!) 16036 Cabling for temperature control equipment , satoru.ikeda

MCF

  • (!) 16041 Recovery of IMC suspension , ryutaro.takahashi

PR3

  • 15889 Traverser motor test and cabling. , fabian.arellano

    • 16001 Comment, satoru.ikeda

    • (!) 16027 Comment , satoru.ikeda

  • 15976 Picomotor of PR3_BF_T(Motor2) got stuck , satoru.ikeda

    • 16000 Comment, satoru.ikeda

    • 16024 Comment , fabian.arellano

    • (!) 16026 Comment , satoru.ikeda

    • (!) 16032 Comment , fabian.arellano

PRM

  • 9449 PRM glitch investigation: , koki.okutomi

    • 15995 Comment, shinji.miyoki

SR3

  • 15963 IM ballast mass adjustment , fabian.arellano

    • 16009 Comment, fabian.arellano

  • 16007 Ballast mass adjustment on top of BF , fabian.arellano

    • 16018 Comment, fabian.arellano

    • (!) 16035 Comment , fabian.arellano

  • 16007 Ballast mass adjustment on top of BF , fabian.arellano

Electronics

Control

Towards O4

Safety

Discussion

Travel Plans

The week from 2/22

  • Takahashi: 2/23-2/28
  • Sato: 2/23-26
  • Hirata: 2/23-26
  • Yano: 2/23-26

The week from 3/1

  • Takahashi: 3/1-5
  • Sato: 3/1-5
  • Hirata: 3/1-5
  • Yano: 3/1-5

Next meeting

  • On 2020/2/26(Fri)