Differences between revisions 15 and 16
Revision 15 as of 2021-02-18 20:28:30
Size: 5083
Comment:
Revision 16 as of 2021-02-19 07:15:18
Size: 5580
Editor: KousekiMiyo
Comment:
Deletions are marked like this. Additions are marked like this.
Line 31: Line 31:
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15997|15997]] Comment, __ryutaro.takahashi__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16023|16023]] Comment , __ryutaro.takahashi__
  * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16034|16034]] Comment , __ryutaro.takahashi__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16023|16023]] Comment, __ryutaro.takahashi__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16034|16034]] Comment , __ryutaro.takahashi__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16050|16050]] Comment ,  __ryutaro.takahashi__
Line 36: Line 37:
  * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16028|16028]] Comment, __satoru.ikeda__
 * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16038|16038]] Initialize the OSEMINF filters for all Type-Bp suspensions , __kouseki.miyo__
  * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16040|16040]] Comment, __kouseki.miyo__
 * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16036|16036]] Cabling for temperature control equipment , __satoru.ikeda__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16028|16028]] Comment, __satoru.ikeda__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16038|16038]] Initialize the OSEMINF filters for all Type-Bp suspensions , __kouseki.miyo__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16040|16040]] Comment, __kouseki.miyo__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16036|16036]] Cabling for temperature control equipment , __satoru.ikeda__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16038|16038]] Initialize the OSEMINF filters for all Type-Bp suspensions , __kouseki.miyo__

'''IX'''
 * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16055|16055]] Setup of BF with the released cryo-payload , __ryutaro.takahashi__
Line 41: Line 47:
 * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16041|16041]] Recovery of IMC suspension , __ryutaro.takahashi__  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16041|16041]] Recovery of IMC suspension , __ryutaro.takahashi__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16049|16049]] Comment, __naohisa.satou__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16041|16041]] Recovery of IMC suspension , __ryutaro.takahashi__

'''PR2'''
 * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16054|16054]] PR2 minirack is moved to 2nd floor , __kouseki.miyo__
Line 44: Line 56:
  *  [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16001|16001]] Comment, __satoru.ikeda__
  * (!)
[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16027|16027]] Comment , __satoru.ikeda__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16027|16027]] Comment, __satoru.ikeda__
Line 47: Line 58:
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16000|16000]] Comment, __satoru.ikeda__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16024|16024]] Comment , __fabian.arellano__
  * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16026|16026]] Comment , __satoru.ikeda__
  * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16032|16032]] Comment , __fabian.arellano__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16024|16024]] Comment, __fabian.arellano__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16026|16026]] Comment , __satoru.ikeda__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16032|16032]] Comment , __fabian.arellano__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16043|16043]] Comment , __fabian.arellano__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16052|16052]] Comment , __fabian.arellano__
  * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16056|16056]] Comment , __fabian.arellano__
Line 52: Line 66:
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=9449|9449]] PRM glitch investigation: , __koki.okutomi__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15995|15995]] Comment, __shinji.miyoki__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16048|16048]] Operation check of Picomotor of PRM IM and BF , __satoru.ikeda__
Line 59: Line 73:
  * (!) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16035|16035]] Comment , __fabian.arellano__
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16007|16007]] Ballast mass adjustment on top of BF ,
__fabian.arellano__
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16035|16035]] Comment , __fabian.arellano__

Agenda/Minutes on 2021/2/19

Zoom Meeting

CRY+VIS Interface Meeting

13:30-

Participants:

Post O3 Upgrade portal

  • Schedule for IX: Released on 2/18. BF is overload.
  • Schedule for IY: Disconnection is scheduled on 3/11.
  • Schedule for EX: Connection is scheduled in the week of 3/15.
  • Corrugate tube fixing jig: Re-measurement is planed in 2/26-3/1 at IYV.
  • Commissioning in air: Commissioning of IX will be started. Other schedule has not been decided yet.
  • Commissioning in vacuum:
  • Acceptance check: Cryo-payload in IX and Type-A tower in EY are on going.
  • PF actuator: Not evaluated in IX, but after the commissioning for suspension.
  • Jig for FC painting: Assembling.

VIS Meeting

14:00-

Participants:

Progress report

EY

  • 15993 Setup of F2 , ryutaro.takahashi

    • 16023 Comment, ryutaro.takahashi

    • 16034 Comment , ryutaro.takahashi

    • 16050 Comment , ryutaro.takahashi

General

  • 15737 We investigated the network connection. , satoru.ikeda

    • 16028 Comment, satoru.ikeda

  • 16038 Initialize the OSEMINF filters for all Type-Bp suspensions , kouseki.miyo

    • 16040 Comment, kouseki.miyo

  • 16036 Cabling for temperature control equipment , satoru.ikeda

  • 16038 Initialize the OSEMINF filters for all Type-Bp suspensions , kouseki.miyo

IX

  • (!) 16055 Setup of BF with the released cryo-payload , ryutaro.takahashi

MCF

  • 16041 Recovery of IMC suspension , ryutaro.takahashi

    • 16049 Comment, naohisa.satou

  • 16041 Recovery of IMC suspension , ryutaro.takahashi

PR2

  • (!) 16054 PR2 minirack is moved to 2nd floor , kouseki.miyo

PR3

  • 15889 Traverser motor test and cabling. , fabian.arellano

    • 16027 Comment, satoru.ikeda

  • 15976 Picomotor of PR3_BF_T(Motor2) got stuck , satoru.ikeda

    • 16024 Comment, fabian.arellano

    • 16026 Comment , satoru.ikeda

    • 16032 Comment , fabian.arellano

    • 16043 Comment , fabian.arellano

    • 16052 Comment , fabian.arellano

    • (!) 16056 Comment , fabian.arellano

PRM

  • 16048 Operation check of Picomotor of PRM IM and BF , satoru.ikeda

SR3

  • 15963 IM ballast mass adjustment , fabian.arellano

    • 16009 Comment, fabian.arellano

  • 16007 Ballast mass adjustment on top of BF , fabian.arellano

    • 16018 Comment, fabian.arellano

    • 16035 Comment , fabian.arellano

Electronics

Control

Towards O4

Safety

Discussion

Travel Plans

The week from 2/22

  • Takahashi: 2/23-2/28
  • Sato: 2/23-26
  • Hirata: 2/23-26
  • Yano: 2/23-26

The week from 3/1

  • Takahashi: 3/1-5
  • Sato: 3/1-5
  • Hirata: 3/1-5
  • Yano: 3/1-5

Next meeting