Differences between revisions 18 and 19
Revision 18 as of 2021-02-19 07:17:30
Size: 5666
Editor: KousekiMiyo
Comment:
Revision 19 as of 2021-02-19 07:19:35
Size: 5704
Editor: KousekiMiyo
Comment:
Deletions are marked like this. Additions are marked like this.
Line 29: Line 29:
'''General''' === General ===
Line 39: Line 39:
'''EY''' === EY ===
Line 47: Line 47:
'''IX''' === IX ===
Line 51: Line 51:
'''PR2''' === PR2 ===
Line 55: Line 55:
'''PR3''' === PR3 ===
Line 67: Line 67:
'''PRM''' === PRM ===
Line 71: Line 71:
'''SR3''' === SR3 ===
Line 79: Line 79:
'''MCF''' === MCF ===
Line 86: Line 86:
=== Electronics === === Electronics (Tanaka-san) ===
Line 88: Line 88:
=== Control === === Control (Miyo) ===

Agenda/Minutes on 2021/2/19

Zoom Meeting

CRY+VIS Interface Meeting

13:30-

Participants:

Post O3 Upgrade portal

  • Schedule for IX: Released on 2/18. BF is overload.
  • Schedule for IY: Disconnection is scheduled on 3/11.
  • Schedule for EX: Connection is scheduled in the week of 3/15.
  • Corrugate tube fixing jig: Re-measurement is planed in 2/26-3/1 at IYV.
  • Commissioning in air: Commissioning of IX will be started. Other schedule has not been decided yet.
  • Commissioning in vacuum:
  • Acceptance check: Cryo-payload in IX and Type-A tower in EY are on going.
  • PF actuator: Not evaluated in IX, but after the commissioning for suspension.
  • Jig for FC painting: Assembling.

VIS Meeting

14:00-

Participants:

Progress report

General

Summary:

  • 15737 We investigated the network connection. , satoru.ikeda

    • 16028 Comment, satoru.ikeda

  • 16038 Initialize the OSEMINF filters for all Type-Bp suspensions , kouseki.miyo

    • 16040 Comment, kouseki.miyo

  • 16036 Cabling for temperature control equipment , satoru.ikeda

  • 16038 Initialize the OSEMINF filters for all Type-Bp suspensions , kouseki.miyo

EY

Summary:

  • 15993 Setup of F2 , ryutaro.takahashi

    • 16023 Comment, ryutaro.takahashi

    • 16034 Comment , ryutaro.takahashi

    • 16050 Comment , ryutaro.takahashi

IX

Summary:

  • (!) 16055 Setup of BF with the released cryo-payload , ryutaro.takahashi

PR2

Summary:

  • (!) 16054 PR2 minirack is moved to 2nd floor , kouseki.miyo

PR3

Summary:

  • 15889 Traverser motor test and cabling. , fabian.arellano

    • 16027 Comment, satoru.ikeda

  • 15976 Picomotor of PR3_BF_T(Motor2) got stuck , satoru.ikeda

    • 16024 Comment, fabian.arellano

    • 16026 Comment , satoru.ikeda

    • 16032 Comment , fabian.arellano

    • 16043 Comment , fabian.arellano

    • 16052 Comment , fabian.arellano

    • (!) 16056 Comment , fabian.arellano

PRM

Summary:

  • 16048 Operation check of Picomotor of PRM IM and BF , satoru.ikeda

SR3

Summary:

  • 15963 IM ballast mass adjustment , fabian.arellano

    • 16009 Comment, fabian.arellano

  • 16007 Ballast mass adjustment on top of BF , fabian.arellano

    • 16018 Comment, fabian.arellano

    • 16035 Comment , fabian.arellano

MCF

Summary:

  • 16041 Recovery of IMC suspension , ryutaro.takahashi

    • 16049 Comment, naohisa.satou

  • 16041 Recovery of IMC suspension , ryutaro.takahashi

Electronics (Tanaka-san)

Control (Miyo)

Towards O4

Safety

Discussion

Travel Plans

The week from 2/22

  • Takahashi: 2/23-2/28
  • Sato: 2/23-26
  • Hirata: 2/23-26
  • Yano: 2/23-26

The week from 3/1

  • Takahashi: 3/1-5
  • Sato: 3/1-5
  • Hirata: 3/1-5
  • Yano: 3/1-5

Next meeting

  • On 2020/2/26(Fri)

KAGRA/Subgroups/VIS/VISMinutes20210219 (last edited 2021-02-20 09:40:40 by RyutaroTakahashi)