Size: 5824
Comment:
|
Size: 6565
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 13: | Line 13: |
* Schedule for IX: Released on 2/18. BF is overload. | * Schedule for IX: Released on 2/18. BF was overload. |
Line 19: | Line 19: |
* Acceptance check: Cryo-payload in IX and Type-A tower in EY are on going. | * Acceptance check: Cryo-payload in IX/EX and Type-A tower in EY/IX are on going. |
Line 29: | Line 29: |
=== Gant Chart === [[attachment:vis_gant_0219.png]] |
=== Schedule === {{http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/VISMinutes20210219?action=AttachFile&do=get&target=vis_gant_0219.png|vis_gant+0219|width=1000}} [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11475|JGW-L2011475-v26]] |
Line 34: | Line 36: |
Line 35: | Line 38: |
* [Ikeda] Investigation of the cable length for network cable and temperature control in center are was done. Investigation for both end station was not. [1,2] * [Miyo] Automation script to make the foton files was made[3]. In this week I reproduce the OSEMINF foton file for all Type-Bp suspension by suing the script. This script will help us to avoid human error. |
|
Line 36: | Line 41: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15737|15737]] We investigated the network connection. , __satoru.ikeda__ | klog: 1. [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15737|15737]] We investigated the network connection. , __satoru.ikeda__ |
Line 38: | Line 44: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16038|16038]] Initialize the OSEMINF filters for all Type-Bp suspensions , __kouseki.miyo__ | 2. [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16036|16036]] Cabling for temperature control equipment , __satoru.ikeda__ 3. [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16038|16038]] Initialize the OSEMINF filters for all Type-Bp suspensions , __kouseki.miyo__ |
Line 40: | Line 47: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16036|16036]] Cabling for temperature control equipment , __satoru.ikeda__ * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=16038|16038]] Initialize the OSEMINF filters for all Type-Bp suspensions , __kouseki.miyo__ |
|
Line 65: | Line 70: |
Line 66: | Line 72: |
[Miyo] I connected the cables for PRM minirack because these had been disconnected from Fujimi-sangyo clean work. |
|
Line 115: | Line 123: |
* '''When will we do the recovering work for type-Bp suspensions?''' * '''Cabling style of the thermistors is reviewed by SEO?''' * |
Contents
Agenda/Minutes on 2021/2/19
CRY+VIS Interface Meeting
13:30-
Participants:
- Schedule for IX: Released on 2/18. BF was overload.
- Schedule for IY: Disconnection is scheduled on 3/11.
- Schedule for EX: Connection is scheduled in the week of 3/15.
- Corrugate tube fixing jig: Re-measurement is planed in 2/26-3/1 at IYV.
- Commissioning in air: Commissioning of IX will be started. Other schedule has not been decided yet.
- Commissioning in vacuum:
- Acceptance check: Cryo-payload in IX/EX and Type-A tower in EY/IX are on going.
- PF actuator: Not evaluated in IX, but after the commissioning for suspension.
- Jig for FC painting: Assembling.
VIS Meeting
14:00-
Participants:
Progress report
Schedule
General
General
Summary:
- [Ikeda] Investigation of the cable length for network cable and temperature control in center are was done. Investigation for both end station was not. [1,2]
- [Miyo] Automation script to make the foton files was made[3]. In this week I reproduce the OSEMINF foton file for all Type-Bp suspension by suing the script. This script will help us to avoid human error.
klog:
15737 We investigated the network connection. , satoru.ikeda
16028 Comment, satoru.ikeda
16036 Cabling for temperature control equipment , satoru.ikeda
16038 Initialize the OSEMINF filters for all Type-Bp suspensions , kouseki.miyo
16040 Comment, kouseki.miyo
Type-C
MCF Summary:
16041 Recovery of IMC suspension , ryutaro.takahashi
16049 Comment, naohisa.satou
16041 Recovery of IMC suspension , ryutaro.takahashi
Type-A
EY Summary:
15993 Setup of F2 , ryutaro.takahashi
IX Summary:
16055 Setup of BF with the released cryo-payload , ryutaro.takahashi
Type-Bp
PR2
Summary: [Miyo] I connected the cables for PRM minirack because these had been disconnected from Fujimi-sangyo clean work.
16054 PR2 minirack is moved to 2nd floor , kouseki.miyo
PR3 Summary:
15889 Traverser motor test and cabling. , fabian.arellano
16027 Comment, satoru.ikeda
15976 Picomotor of PR3_BF_T(Motor2) got stuck , satoru.ikeda
PRM Summary:
16048 Operation check of Picomotor of PRM IM and BF , satoru.ikeda
Type-B
SR3 Summary:
15963 IM ballast mass adjustment , fabian.arellano
16009 Comment, fabian.arellano
16007 Ballast mass adjustment on top of BF , fabian.arellano
Electronics (Tanaka-san)
Control (Miyo)
Towards O4
- Type-B/Bp remedy work is on going.
- Installation of Type-A is on going in EY.
- Schedule.
- Procedure documents.
- Criteria in the acceptance test.
Safety
Discussion
When will we do the recovering work for type-Bp suspensions?
Cabling style of the thermistors is reviewed by SEO?
Travel Plans
The week from 2/22
- Takahashi: 2/23-2/28
- Sato: 2/23-26
- Hirata: 2/23-26
- Yano: 2/23-26
The week from 3/1
- Takahashi: 3/1-5
- Sato: 3/1-5
- Hirata: 3/1-5
- Yano: 3/1-5
Next meeting
- On 2020/2/26(Fri)