Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2021/5/21 13:00-
Participants:
Schedule
- IX: Yaw FR was adjusted and the chamber was closed on 5/17-18.
- IY: Acceptance review is scheduled on 5/21. Remedy of the pre-isolator is postponed.
- EX: Parts to modify the addtional FR will be delivered on 5/24.
- EY: Installation of the tower is on going. Items (pure water maker, etc.) for the mirror cleaning are under preparation.
Status
- Corrugate tube fixing jig: Other 3 sets will be ready by the end of June.
- TM height setting: Height standard around the cross tube was made in IX/IY.
- Commissioning in air: Started on the pre-isolator in IX.
- Commissioning in vacuum:
- Overall commissioning:
- Acceptance check: Group work is set every Friday to make the acceptance check document.
- PF actuator: After SC.
- Jig for FC painting: Tested in this week.
Discussion
VIS Meeting
14:00-
Participants:
Schedule
See Schedule
- Type-A team: IXV 5/24, EXV 2/25, EYV 5/24-28
- Type-B team:
Milestone
IMC suspensions are ready in air [40] will finish 2011/04/21.
PRs are ready in air [643] will finish 2011/07/09.
ETMX is ready in air [656] will finish 2021/08/25.
ITMX is ready in air [657] will finish 2021/08/31.
ETMY is ready in air [658] will finish 2021/09/16.
ITMY is ready in air [659] will finish 2021/11/08.
BS is ready in air [691] will finish 2011/11/24.
SRs are ready in air [663] will finish 2011/12/20.
Output suspensions are ready in air [695] will finish 2011/12/21.
TMSY is ready in air [708] will finish 2011/??/??.
TMSX is ready in air [684] will finish 2011/??/??.
2021/03/29 updated
Klog
EX
16535 Height adjustment of ETMX , ryutaro.takahashi
General
16506 Deleted unnecessary processes from VIS model file. , satoru.ikeda
IX
16421 Height adjustment of ITMX , ryutaro.takahashi
MCE
16512 MCe oplev characterization , takaaki.yokozawa
MCF
16498 Type-C simulation model , yoichi.aso
16501 Oplev calibration MCo , takaaki.yokozawa
16500 Characterization of optical lever MCi , takaaki.yokozawa
16537 MCo suspension strange , tomotada.akutsu
16157 Investigation of IMC suspensions , ryutaro.takahashi
16513 Comment , kouseki.miyo
PR3
16520 Thermistor installation , fabian.arellano
16521 Setting the mirror to nominal height , fabian.arellano
16348 Tightening the locating clamps for the piano wire. , fabian.arellano
16502 Comment , fabian.arellano
16520 Thermistor installation , fabian.arellano
16533 Comment , fabian.arellano
16521 Setting the mirror to nominal height , fabian.arellano
PRM
SR2
16509 Lowering the pre-isolator , fabian.arellano
This is generated by python script in /users/Miyo/dropbox/Script/scrapping/main.py.
Summary Report
TypeA
TypeB
Type-Bp
TypeC
Electronics
Control
Safety
Discussion
Travel Plans
The week from 5/24
- Takahashi: 5/24-28
- Sato: 5/24-28
- Hirata: 5/24-28
- Yano: 5/24-28
The week from 5/31
- Takahashi: 5/31-6/4
- Sato: 5/31-6/4
- Hirata: 5/31-6/4
- Yano: 5/31-6/4
Next meeting
- 2021/5/28(FRI)