 * EY: Repair of cables was scheduled on 8/31. Load adjustment was scheduled on 9/2.  * EY: Repair of cables was scheduled on 8/31. Load adjustment was scheduled on 9/2. Chamber closing is scheduled on 9/6-8.

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2021/8/27 12:30-

Participants: Takahashi, Tomaru, Ikeda, Aso, Hirata, Sato, Ushiba

Post O3 Upgrade portal

Schedule

  • IX: In finalization.
  • EX: In finalization. Installation of ACCs will be scheduled in the next-next week.
  • IY: Height measurement/adjustment was scheduled on 9/1.
  • EY: Repair of cables was scheduled on 8/31. Load adjustment was scheduled on 9/2. Chamber closing is scheduled on 9/6-8.

Status

  • TM height setting: ITMY.
  • Commissioning in air: On going in X-arm.
  • Commissioning in vacuum:
  • Overall commissioning:
  • Acceptance check: Every Friday.
  • PF actuator: At the in-vacuum commissioning.
  • New vacuum pumps for V-chambers:

Discussion


VIS Meeting

Cancel

Participants:

Klog

This is generated by python script in /users/Miyo/dropbox/Script/scrapping/main.py.

Summary Report

Type-A

Type-B

Type-Bp

Type-C

Electronics

Control

Schedule

See Schedule

  • Type-A team:
  • Type-B team:

Milestone

  • IMC suspensions are ready in air [40] will finish 2021/04/21.

  • PRs are ready in air [643] will finish 2021/07/09.

  • ETMX is ready in air [656] will finish 2021/08/25.

  • ITMX is ready in air [657] will finish 2021/08/31.

  • ETMY is ready in air [658] will finish 2021/09/16.

  • ITMY is ready in air [659] will finish 2021/11/08.

  • BS is ready in air [691] will finish 2021/11/24.

  • SRs are ready in air [663] will finish 2021/12/20.

  • Output suspensions are ready in air [695] will finish 2021/12/21.

  • TMSY is ready in air [708] will finish 2021/??/??.

  • TMSX is ready in air [684] will finish 2021/??/??.

2021/03/29 updated

Safety

Discussion

Travel Plans

The week from 8/30

  • Takahashi: 8/31-9/3
  • Sato: 8/30-9/3
  • Hirata: 8/30-9/3

The week from 9/6

Next meeting

  • 2021/9/3(FRI)